Forum quick links
New RP threshold for EAp1?
EBOM-2009 RPc1:Regional Priorityposted by Donna Juselis on
We are currently working on a project in NC (zip 27244). The regional priority threshold for EAp1 Option 1 is supposed to be 28% (new bldgs) and 24% (existing bldgs).
What is an intersection?
ND-v2009 SLLc1:Preferred locationsposted by Timothy Nabholz on
I am currently using a radii around one of our potential sites and am trying to calculate how many intersections are within that radius.
LEED for Homes or NC
posted by Courtney Royal on
Can a single family 7-floor home in Manhattan go for LEED-NC?
Electricity Consumption - Option D
NC-2009 EAc5:Measurement and Verificationposted by Yu Wang on
I'm working on an option D M&V plan according to LEED.
LEED HC WEc4.2 vs Pilot Credit 17
Pilot-Credits WEpc17:Cooling tower water useposted by April Eisenhauer on
A long-term healthcare project I have been working on that was registered under LEEDv2.2 recently got resistance for submitting LEED HC WEc4.2 as an ID credit.
Building with half renovation
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Jatuwat Varodompun on
We purchased an abandon building which will be renovated for both envelope, Electric, and HVAC. The problem is we will own only have of the building.
100% OA System or Multiple Zone Recirculating System?
NC-2009 IEQp1:Minimum IAQ Performanceposted by Gaston Viau on
Our project is an office building for 60 FTE. It has just one air handler which supplies 100% outdoor air to 2 big working spaces (1st floor & 2nd floor).
Oyster Shells?
NC-2009 MRc6:Rapidly Renewable Materialsposted by Abena Darden on
Hello All - I had what is no doubt one of the oddest, but at the same time intriguing, questions ever asked me by a contractor today.