Ice-cream factory with sub-zero working conditions
NC-2009 IEQc7.1:Thermal Comfort—Designposted by André Harms on
Good day, The project I'm working on is an ice-cream factory which will have staff working for short spells (but more than 15min) in spaces cooled to down to -40C.
New Construction vs Major Renovation
NC-2009 EAp2:Minimum Energy Performanceposted by Ritwik Kakati on
Our project consists of renovation of 140,000 SF of an existing building, as well as the addition of 30,000 SF of new space.
Auto Service/Repair
NC-2009 SSc2:Development Density and Community Connectivityposted by R W on
Would an auto service/repair business count as a basic service? What about a place that sells landscaping materials? Insurance Brokers? Skatepark? Thanks!
Process load significantly lower than 25%
NC-2009 EAp2:Minimum Energy Performanceposted by Panupant Phapant on
The overall process load of our project turns out to be in the vicinity of 15% only. We are aware that 15% is absurdly low and unusual for plants.
Minimum Ventialtion Rates: Locker Rooms
NC-2009 IEQp1:Minimum IAQ Performanceposted by Lawrence Lile on
I am working on a project which has an employee locker room, where truck drivers will come to change or shower after their shifts once a day.
Mandatory provision 5.4 for existing building
NC-2009 EAp2:Minimum Energy Performanceposted by Charalampos Giannikopoulos on
For an existing building under major renovation would the mandatory provision 5.4.3.4 for vestibules be still applicable even if the project scope does not include any additions or plan modificatio
LEED 2009 CI Preliminary Combined Review
CI-2009 IEQp1:Minimum IAQ Performanceposted by Aparna Maladkar on
Hello, I am new to LEED and need some assistance before issuing for preliminary combined review. I have completed all the required project and pre-requisites forms.
signed lease agreement question
CS-2009 EAp2:Minimum Energy Performanceposted by emily reese moody on
Hello, Can you please confirm if the signed lease agreement page needs to include the tenant signature?
VAV Fan control for baseline system 6
NC-2009 EAp2:Minimum Energy Performanceposted by Panupant Phapant on
We have a rough time seeking to reduce supply fan energy during energy simulations.
Submeters to measure AND RECORD energy use
CI-2009 EAc3:Measurement and Verificationposted by Michael Smithing on
In our project the tenant pays a lump sum for thermal energy use, but pays for electricity based on actual consumption. We therefore cannot achieve the 3 points.