Uploads and deleting uploads - is the webinar posted somewhere?
posted by Susan Di Giulio on
I watched the webinar on how to use the new site on January 5, and I have been to the uploads page for the project in question but I can't remember how to upload docs and how to delete previously u
What if only 2 of 3 stairwells meet daylighting requirement?
Pilot-Credits EQpc78:Design for active occupantsposted by Steve Loppnow on
In a multi-family project, we have 2 of 3 stairwells that meet the daylighting requirement. Would we still be able to claim credit for the daylighting option, as 1 of our 7 features?
Option 2 for submetered irrigation
EBOM-v4 WEc1:Outdoor water use reductionposted by Charalampos Giannikopoulos on
If we install subsystem metering for the irrigation systems to comply with WE credit Water Metering can we still select Option 2 (No irrigation meter installed: Calculated water budget).
LEED CI or not?
posted by Melissa Merryweather on
GBCI staff have just informed a colleague that his project can be certified CI.
Occupant Comfort Survey - draft from LEED User
EBOM-2009 IEQc2.1:Occupant Comfort—Occupant Surveyposted by Oana Stamatin on
We used with success in the past the Template for Occupant Comfort Survey from Resources tab, but for our fifth project the following GBCI comment was received: "The survey does not appear to addre
VOC Budget shortcut?
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Rick Farrell on
We are a wood floor contractor who often does site finished wood floors on commercial LEED projects, mostly in Texas. The water based urethane we use states the following on the MSDS VOLATILE ORGAN
calculating shipping costs for multiple items
NC-2009 MRc4:Recycled Contentposted by Amy Blizzard on
I can't find how to factor in shipping for multiple items. For example, under the MRc4 - I have four items from one company, so the four will be shipped together.
5-year lease + Letter of commitment for another 5 year extension
CI-2009 MRc1.1:Tenant Space—Long-Term Commitmentposted by Annabelle Cruz on
Our project has a lease agreement for 5-year period only as the leasing protocol of the Landlord is maximum of five years with option to renew.
LEED/ASHRAE definition of a preheat coil?
NC-2009 EAp2:Minimum Energy Performanceposted by Rock Ridolfi on
The proposed system includes an ERV serving two packaged rooftop units.
process load
NC-2009 EAp2:Minimum Energy Performanceposted by Florian Schmidtchen on
We have currently a LEED NC project of an office building with a data center in the basement.