Check out the Case 2 definition on page 95 of the 2009 Reference Guide. Rate and quantity are both clearly required there and I expect this is the standard to which your submittal will be held.

Thu, 06/03/2010 - 07:14

Thanks Amy. Strange that it's not on the requirements page though. There the rate is clearly ommitted. This should be corrected in the next addenda hopefully.

Thu, 06/03/2010 - 13:50

This stems from historical LEED-CS 2.0 submittal template for example...where for option 2 only the quantity is required. This is unfortunately still the case in LEEDv3 LEEDonline submittal form still only requires the volume for case 2...that's why I asked.

Thu, 06/25/2015 - 08:01

Hi there! Apologies for reawakening a 5 year old conversation but I had a query that was similar to the above conversation. Under case 2, I have calculated both the volume of captured runoff and drawdown rate for my project as per equations 1 & 2 in the reference guide (I also used the cheyenne botanic example as a reference point and everything looks good on my calculations). However, the LEED form seems to only require the percent reduction from runoff quantity (cf/storm). Is there some sort of formula that I have missed out on? Thanks in advance for any guidance provided!

Fri, 06/26/2015 - 18:37

Hi Sheena! You should check that you have the latest version of the form. If not, request it through the web.