Forum quick links
LEED for Health Care or NC registration
posted by Razan Nejem on
is it mandatory for a health care facility to register under LEED HC rating system or can it choose to go with LEED NC?
New LEED boundary definition for SSc8
posted by Bill Swanson on
10/1/2012 ID# 10236 MPR/Prerequisite/Credit: SSc8: Light Pollution Reduction Primary Rating System: New Construction v2009 Ruling All instances in the credit language of "LEED project boundary" or
Fire Stopping Sealants
NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Mariah Grife on
I am currently tracking the LEED Data for a construction project I am on.
street network
Pilot-Credits PC9:Street Networkposted by Sara Aschliman on
It appears that our project will qualify for this point, and I do believe that the spirit of the credit positively reinforces the walkability of our neighborhood site as the increased intersections
MPR 6 - Energy Star Portfolio Manager not for future buildings?
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by Cassandra Kail on
I am currently working on a LEED-NC 2009 Multiple Building Project. We are having a problem with MPR 6; commit to showing whole-building energy and water use data.
definition of greenfield for commercial interiors
CI-2009 SSc2:Development density and community connectivityposted by Ken Dooley on
Hi all, how can a fit-out that is to be certiifed by commercial interiors be a "greenfield development" ? Surely once the core and shell project is completed, the fit-out is on a previously develop
Alternative Compliance Path Case 1: Lease Document
CI-2009 EAc3:Measurement and verificationposted by Carolina Acevedo on
Is there an alternative compliance approach to this credit? My project falls under Case 1 (less than 75% of the project space), but my client owns the floors hence the lack of a lease agreement.
Undefined Outdoor Spaces
CS-2009 SSc6.1:Stormwater design - quantity controlposted by Luis Miguel Diazgranados on
Greetings Everyone I'm working on a office project with outdoor spaces within the LEED Boundary. The project's construction phase is almost finished.
Material-Efficient Framing based on LEED-Homes?
NC-2009 IDc1:Innovation in designposted by Heather DeGrella on
Has anyone tried an ID point for NC, based on the Material-Efficient Framing credit in LEED for Homes?
Determining Baseline for Mixed Use
NC-2009 EAp2:Minimum energy performanceposted by Jason Biondi on
Hi all, thanks for the forum. The building is 8 stories, 3 flrs office, 3 floors parking, 1 retail, 1 resturaunt. Is it accepabable to use the 5 story building baseline schedule if the parking gara