Forum quick links
LEED Boundaries & Construction Boundaries
NC-2009 SSp1:Construction Activity Pollution Preventionposted by soha yamani on
ESC Plan and Project LEED Boundary in Campus project we are working on a campus LEED project that have four different contractors working on four different buildings that will be registered for LE
renewable energy sold to the grid
NC-v4 EAc2:Optimize energy performanceposted by Francesco Passerini on
In order to calculated the points relative to NC-v4 EAc2 - Optimize energy performance shall the produced electric energy from a renewable source that is sold to the national gri
Direct vs Indirect Lighting Strategy A - does Guidance illustration comply?
Retail-NC-v4 EQc6:Interior lightingposted by Joyce Kelly on
The illustration used for Strategy A under Guidance for Direct vs Indirect Lighting includes a Luminance diagram with 11,286 cd/m2 at 45 deg. and 0 above this mark.
Energy Star prescriptive path
Homes-v4 EAc1:Annual energy useposted by Gustavo De las Heras Izquierdo on
Hallo,
Window Treatment - Roller Blinds - IEQ 4 ?
posted by kullboys boys on
Hello everyone
Material Recovery Facility - Requirement Area
CS-2009 MRp1:Storage and Collection of Recyclablesposted by John Raymond Dimailig on
Hi Ma'am/Sir,
drainage area for sediment basin
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Hongyun Zhou on
when calculating the volume of sediment basin, what is the drainage area? Should I use footprint of the building or total land area of LEED boundary?
Direct vs indirect measurements
NC-2009 EAc5:Measurement and Verificationposted by Cesar Ruiz on
Hi everyone, We are working on a Residential New Construction Project, compound of more than 100 apartments, pursuing Option D - Calibrated Simulation.
Electric fueling stations for two projects in one garage
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Maria Porter on
Hi all!