Forum quick links
Path to Zero Carbon pdfs/word docs
posted by Kjell Anderson on
Hi all - I've heard from a few of you that you are interested in doing a book club or other internal education based on the Path to Zero Carbon.
Job Posting: Sustainability Director at MCG ExD (remote position)
posted by Laurel Chadzynski on
Hello, fellow SDLs,
First public comment draft of LEED v5 BD+C/ID+C: Energy and Atmosphere
posted by Nadav Malin on
Share your comments on the first public comment draft of LEED v5 BD+C/ID+C: Energy and Atmosphere category on this forum.
Energy Star Rated Equivalent
posted by Roshan Pradhan on
Does TM-21 tested LED luminaire, with efficiency greater than 94% at 6000 hours meets the alternate equivalent criteria for Energy star rated products?
Appendix 2 default values
posted by Julio Fernandez Amodia on
Dear all,
I am currently estimating the occupancy of a mall building. I have determined the occupancy following Appendix 2 default occupancies from LEED.
Purple Roof
NC-v4 SSc5:Heat island reductionposted by Edgar Arevalo on
Has anyone encountered a project where the client or other circumstances suggested we look into purple roof solution. From the looks of it, it's a green roof solution with optimized stormwate
Entryway system
CI-v4 EQc1:Enhanced indoor air quality strategiesposted by RAMON CHRISTOPHER MEDRANO on
I have a office space project, that will have an entryway system (walk off matt).
LEED ND Plan on Indoor Water Use Reduction
ND-Plan-v4 GIBp3:Indoor water use reductionposted by Michael Wahjudi on
Hi all,
Minimum Program Requirements - Must use a reasonable site boundary: site + building
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Theresa Lehman on
This is a complex, multi-part question. An airport project is being phased and has multiple contracts. The scope includes replacing the runways and concrete around the terminals.
Pilot Credit INpc155
Pilot-Credits INpc155:Design for Indoor Air Quality and Infection Controlposted by Roxanne Button on
Has anyone attempted this Pilot Credit yet? Our project is a college science building which was under construction during the COVID-19 shutdown, and already incoporates most of the requiremen