Forum quick links
Carpet tile approved as acceptable walk-off mat
EBOM-2009 IEQc3.5:Green Cleaning—Indoor Chemical and Pollutant Source Controlposted by Melissa Vernon on
Carpet tile is now an acceptable entryway system per LEED Interpretation Ruling ID#10252 https://www.usgbc.org/leedinterpretations/LISearch.aspx?liaccessid=10252 Carpet tile is a highly desired w
Getting "enough" air into little-used corridors
NC-2009 IEQp1:Minimum IAQ Performanceposted by Rob Watson on
I'm working on the certification of a completed project in Russia.
LEED-NC Building Within New Complex
NC-2009 SSc2:Development Density and Community Connectivityposted by Ali Kassid on
We are working on the design of a new Campus comprises 5 faculties along with 14 buildings including residential, public, and ancillary facilities.
MRc3-Working Product Sustainablity Criterias without cutsheets
EBOM-2009 MRc3:Sustainable Purchasing—Facility Alterations and Additionsposted by Trunnell Levett on
I am working on MRC3 tracking and documentations without available cut sheets-just purchasing receipts.
Process Energy
NC-2009 EAc1:Optimize Energy Performanceposted by John McCullough on
Hi I am using option 1 a computer simulation model to carryout the calculations. I am trying to get the additional points for demonstrating the cost reduction in Process energy.
Overlapping LEED boundaries - Future development
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Becky Dix on
I posted this in the PIf1 forum before seeing this one. I tried to delete it there, but couldn't see how.
LEED-ND v2009 Sunset
posted by Susan Di Giulio on
Does the June 2015 sunset date for LEED-NC v2009 apply to LEED-ND as well?
BAS localized lighting
EBOM-2009 EAc3.1:Performance Measurement—Building Automation Systemposted by ethan adams on
Motion sensors seem to be a natural, low-cost localized lighting control for this credit except for this one line: "Demonstrate that the BAS is being used to inform decisions regarding changes in b
Measurement and Verification for two building campus (metering)
NC-2009 EAc5:Measurement and Verificationposted by Saju Varghese on
Hello.