Building Flush Out Inquiry
EBOM-2009 IEQc1.5:IAQ Best Management Practices—Facility Alterations and Additionsposted by Sheena Moses on
We are currently working on an EBOM Retail project which is undergoing fit out works to the common mall and tenant areas.
Wash Bay Water Use
NC-v4 WEc2:Indoor water use reductionposted by caroline schroeder on
The building that I am currently working on features a single wash bay for large service trucks. I am wondering how this will effect my indoor water use.
LEED Form MR 4
NC-2009 MRc4:Recycled Contentposted by juan pena on
The assembly as % of product section found in the MR 4 form is already prefilled with 100% for all materials. Is this correct?
Geothermal energy loads
NC-2009 EAp2:Minimum Energy Performanceposted by Tim Murray on
We are designing a classroom building on a university campus that will house a geothermal energy substation in its basement.
International Project - Case 2 Option 1 or Option 2
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Sheena Moses on
Dear all, We have a retail mall in Malaysia targeting LEED EBOM v2009 rating.
Ceiling Step Down
NC-v4 EQc8:Quality viewsposted by Kim Lombard on
Does anyone have a good sense of how to treat step down ceiling heights in calculating the interior distance qualifying for quality views?
Undisturbed site areas within LEED project boundary?
CS-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Edgar Arevalo on
I have a project where a patch of forestry has been removed for a new university building.
Can general Contractor act as LEED Project Adminstrator?
posted by Ammar Yahia on
Is it possible for the general contractor to act as LEED Project administrator, the case we have here as the consultant in that Design-bid -Build Contract, is that ministry (owner) has assigned LEE
Reposting this from a v4
posted by Tristan Roberts on
Report Contents
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Omar Elrawy on
Concerning Upload IEQp2-5, it is required to upload a differential air pressure test report for each designated smoking room.