Forum quick links
ACP for Certified Wood vs Pilot for Legal Wood
posted by Terrapin BrightGreen on
The "LEED 2009 Global Alternative Compliance Paths Credit Table" (http://bit.ly/2ovIELH) does not include an ACP for C&S MRc6 Certified Wood, but there does exist a pilot for Legal Wood (http:/
WE_Cr1 "Outdoor Water Use Reduction": Installation of a well
NC-v4 WEc1:Outdoor water use reductionposted by Francesco Passerini on
Is it possible to install a well specifically to collect groundwater for irrigation to meet the intent of the credit to reduce potable water use for irrigation?
Model Calibration - Margins for Error
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Ciaran McCabe on
For a new office building would it be acceptable to use these error margins for an M&V Report.
Hotel Occupancy
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by jupiter luner on
I've determined the occupancy for a hotel project we are working on based upon LEED interpretation 2706606.
Hotel Recycling Note
NC-2009 MRp1:Storage and Collection of Recyclablesposted by jupiter luner on
On a hotel project we are trying to avoid putting two bins within the rooms.
Onsite solar PV generation - 10 years contract
EBOM-v4 EAc7:Renewable energy and carbon offsetsposted by Ameet AA on
Hi, Is it compulsory to sign a 10 years contract with the solar PV supplier (the PV panels are installed on the rooftop of the project building)?
GREEN POWER - WIND Mills
NC-2009 EAc6:Green powerposted by SAMY Chamy on
Dear Concern:- Our client produce huge amount of Renewable energy by wind mills and the energy produced via wind mill is almost 5 times greater than LEED project annual energy consumption so pl
WEp1 Form V01
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Melissa Merryweather on
Hi, I have form V01 for WEp1, and I can't find any information to say that this form has been updated (V01 is the only one listed on USGBC forms source), but there was a reference somewhere to an u
Water Pressure to Fixtures
CS-v4 WEp2:Indoor water use reductionposted by Ciaran McCabe on
Is it an absolute requirement that the proposed pressure (in PSI) matches the baseline. Can we use a flow rate at a lower pressure to avoid excessive pump sizes ?
Samples from Stopwaste.org
EBOM-v4 EQc4:Interior lightingposted by Alexa Stone on
Can someone please send me the pdf sample from StopWaste.org? I can't open it from here. Thanks! Alexa www.ecopreserve.net