Design Engineer for EAp1 and CxA for EAc3
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Amy Harmon on
I've got a new building that is less than 50,000 SF.
Pilot Credit 87: Verified C&D Recycling Rates
Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by David Dixon on
have several project and have had to work with the contractors and their LEED coordinator to select a company that is verified for this credit.
Question for Required Documentation for Option 1 of this credit
EBOM-v4 SSc1:Site Development- protect or restore habitatposted by JOHN COOK on
I would like to know if USGBC requires the specific species name for plants for this credit, as stated in the reference guide "site plan indicating the project boundary, building footprint, site ar
Renewable energy in EAc1
NC-2009 EAc1:Optimize Energy Performanceposted by VICTOR MORENO on
Hello. I have modeled a proposed building including PV and solar thermal systems.
Required Documentation: All Projects for Site Management credit
EBOM-v4 SSc5:Site managementposted by JOHN COOK on
Hello, Is there an example of an acceptable "air quality protection log" that USGBC is looking for in this credit?
Using LEED v4 standards for this credit
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Jenelle Shapiro on
Is it possible to use the LEED v4 standards (ULEF of NAF) to apply for the LEED 2009 credit?
Ask about light and views Index
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Jose Alfonso Vergara Vasquez on
Hi , I wonder what happens when you have more windows than is required and the index exceeds the recommended? Thanks.
Construction Waste management
NC-2009 MRc2:Construction Waste Managementposted by Piotr Podhajny on
What if you have two buildings each persuing LEED certification both build by the same contractor but two owners. How do you seperate the waste amount from both building?
Alternative Walkability Features
Pilot-Credits PC14:Walkable Streetsposted by Emily Loquidis on
Has anyone successfully submitted alternative approaches other than the 9 factors listed within the credit requirements.
ASHRAE Baseline Constructions - with two building types
NC-2009 EAc1:Optimize Energy Performanceposted by Alice chen on
Hi all, Has anybody have experience in working on a large warehouse connected with a small office building? I imported two baseline constructions, one is semiheated for warehouse, the other is no