Existing Laboratory Equipment

CI-2009 EAp3:Fundamental Refrigerant Management
posted by  Michele Helou  on 

Ok - consensus has been and reviewers have supported that existing base building HVAC and central plant systems are exempt from this prereq. Now, does anyone know if reused equipment - laboratory

1
Mon Mar 6, 2017, 4:34 pm

College Campuses

Pilot-Credits EQpc78:Design for active occupants
posted by  Allen Schaffer  on 

We are submitting a 90,000 SF Humanities Building on a commuter campus. The agency owner has eliminated practically all interior parking over the last 5 years.

0

Classroom Building on a Commuter College Campus

Pilot-Credits PC14:Walkable Streets
posted by  Allen Schaffer  on 

Our 90,000 SF Humanities Building on a commuter college campus was just about the most perfect project for this pilot credit.

0

LEED Retail CI EAc1.3 zoning and controls

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Francisco Aguirre  on 

Hi, I am working on a retail project with a VAV system where zoning is performed by variable dampers controlled by thermal sensors in each different thermal zone.

1
Mon Jul 11, 2016, 5:07 pm

Absoprption material instead of rainwater tank

CS-2009 WEc1:Water Efficient Landscaping
posted by  FABIO VIERO  on 

Dear all, we are in the case that it is not possibile to provide a rainwater tank on site so we are exploring the possibility to use a “local harvesting” system.

1
Thu Jan 19, 2017, 2:14 pm

site fence

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Agnieszka Rylska  on 

Are there requirements regarding specific fence type around the site?

1
Sat Aug 26, 2017, 9:50 pm

Copy area in office - acoustical treatment

CI-v4 EQc9:Acoustic performance
posted by  Leticia SooHoo  on 

Hi, we are designing an office space which will have a copy area ( 2 to 3 floor model copiers) adjacent to an open office space.

1
Thu Jan 19, 2017, 9:22 pm

Compliance with WEp1 building that was constructed after 2007 bu

EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by  MKK LEED  on 

Hi, We have a project that is an existing building that was constructed in 2007, but it has water closets with greater consumption than 1.6 gpf (6lpf).

1
Fri Jul 29, 2016, 10:50 pm

Lr value for refrigerant calculations

NC-2009 EAc4:Enhanced Refrigerant Management
posted by  Francisco Aguirre  on 

Dear all, I am currently working on a project with a VRF system. We have contacted the manufacturer for non-default refrigerant leakage rate values.

1
Mon Aug 22, 2016, 7:05 pm

Supporting Documents for EAp2 and EAc1

CS-2009 EAc1:Optimize Energy Performance
posted by  Alice chen  on 

Hi all, I am working on a LEED 2009 NC project with IES energy modelling. Could anybody advise what documents need to be submitted for EAp2 and EAc1 certifications?