Forum quick links
CONFUSED IN EAP2 STRATEGY FOR A MASTER SITE PROJECT
NC-2009 EAp2:Minimum Energy Performanceposted by VEL MUTHU on
Hello everyone, I am currently working on a project which consist of 8 buildings(3 main buildings and 5 supportive building, all are between 8000 to 60,000 sq ft), we are targeting certification le
minimum area requirement for energy modelling
NC-2009 EAp2:Minimum Energy Performanceposted by VEL MUTHU on
do we have any area requirement for energy modeling i.e. Minimum area to opt for Option 1 Whole building energy modeling aproach for EAP2?
Integrative Pilot Credit - Design or Construction Credit
Pilot-Credits PC60:Integrative Processposted by Devki Wright on
Hi there - when submitting the documentation for this credit, is this considered a design or construction credit?
LEED-GA as a student
posted by PRATIK KUMAR on
Hello everyone, Kindly help me out in providing a proper knowledge about LEED-GA exams as a student. As i am a working professional and doing my PG-Diploma in Urban planning as part time,and also i
new Alternative Compliance Path
posted by Tristan Roberts on
As we reported on BuildingGreen.com (see Dynamic Plaque Piloted as LEED Performance Path)
new ACP featuring Dynamic Plaque
posted by Tristan Roberts on
As we reported on BuildingGreen.com (see EBOM certification. From the article:
Bus service in opposite directions
Healthcare-v4 LTc5:Access to quality transitposted by Bryan Finnegan on
The credit requires "Qualifying transit routes must have paired route service (service in opposite directions)" We have two transit routes that run within the required distance of an entry, but th
District Central plant heating only
NC-2009 EAp2:Minimum Energy Performanceposted by Vipul Babriya on
I have a project with district steam from central plant for space heating only. The space cooling is provided by onsite using RTUs with Dx coil.
Updating documentation with consistent or more recent dates?
posted by Sara Goenner Curlee on
For various reasons, my project's Design Submittal got put on hold in 2014 after most of the work effort was done and uploaded to LEED Online.
Glass Canopy over new concrete
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Haley Duncan on
Hello, I have a similar question to the post labeled " Glass Canopy over Compliant Hardscape." We have a glass canopy over new concrete. Can I count this area as compliant?