Forum quick links
Occupancy Sensors and 9.4.1.1
NC-2009 EAp2:Minimum Energy Performanceposted by Curt Pascoe on
We are looking at a high rise residential project, to be NCV2009. Our electrician is stating all hallways need occupancy sensors.
Defining landscaped areas
NC-2009 WEc1:Water Efficient Landscapingposted by Veronika Kozlova on
Dear all, Our project has a landscaped area that includes trees, shrubs and grass.
Retail Refrigeration
Retail-NC-v4 EAp4:Fundamental refrigerant managementposted by Jason Smith on
I am currently working on a new retail construction project and would like to know if we should include the chilled drink cabinets (fizzy drinks, Milk etc.) within the Fundamental Refrigeration Cal
LEED Boundary and Non-contiguous reconfigured areas
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Aaron Ketner on
Our project is currently registered under NC 2009. This 66,500sf project consists of a new classroom addition to an existing 53,000sf building, which achieved LEED silver under NC 2.2.
EBOM Solid Waste Management Policy in Medical Office Building
NC-2009 IDc1:Innovation in Designposted by Sara Goenner Curlee on
My project is pursuing LEED NC, and was hoping to use MRp2 as an innovation credit.
Waste Management
NC-2009 MRc2:Construction Waste Managementposted by Ali Scander on
Hello, I'm concerned about our project earning points for MRc2.
Two Identical Buildings
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Paula Hernandez on
Hi, we want to achieve the Precertification for a CS project. There are two office buildings, almost identical, on the same parcel. They share four underground parking levels.
Baseline Economizers
Retail-CI-v4 EAp2:Minimum energy performanceposted by Paula Hernandez on
Standard ASHRAE 90.1-2010 states that Outdoor air exonomizers shall be included in baseline HVAC systems 3 trhough 8, with the exception 6.5.1d: Systems that include a condenser heat recovery syste
Recycling area for MR Pre-req in a small historical building
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Veronica Reed on
Hello We are developing a ver small 12 room hotel in a historical landmark building in the historic center of Quito, all houses in the block from late 1800's, thus the building was a former single
Technical Advice
EBOM-2009 EAc6:Emissions Reduction Reportingposted by Eleftherios Zacharakis on
Hi, we used ENERGY STAR Portfolio Manager to estimate the CO2 emissions of a project.