Insulation of Piping Cast into Concrete

NC-2009 EAp2:Minimum Energy Performance
posted by  André Harms  on 

We are working on a project where a significant amount of the domestic hot water ring feed piping will be cast into the concrete walls, and the designer is querying if these pipes will need to be i

1
Fri Nov 6, 2015, 2:46 pm

25'-0" Max Footpath to Main Staircase

Pilot-Credits EQpc78:Design for active occupants
posted by  Kelsey Jensen  on 

Our current project places the main staircase in view of the main lobby and corridor.

1
Mon Nov 9, 2015, 8:17 pm

District Co generation Plantby

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  satheesh M  on 

Hi, The building is catered by own chiller plant located in the building & building owned DES Cogeneration plant for the space cooling.

1
Tue Nov 10, 2015, 11:50 pm

Role

LEED for Homes (LEED-H) Forum
posted by  Gustavo De las Heras Izquierdo  on 

Who is responsible for reviewing project drawings, specs and calculations BEFORE submitting them to the builder: the QAD, the Green Rater or a LEED for Homes Consultant? Our experience outside the

1
Mon Nov 9, 2015, 2:41 pm

Help with LEED assessment from USGBC?

General forums
posted by  Susannah Goddard  on 

I am undertaking a LEED assessment on a large project in the UK. We have undergone the Design Stage Review (both preliminary and final) and have some outstanding issues to be appealed.

1
Mon Nov 9, 2015, 4:48 pm

Number of chillers in Energy Model

Data-Centers-NC-v4 EAc2:Optimize energy performance
posted by  Izumi Takayama  on 

Hi, I am currently preparing an energy model for a data center project (system 8).

1
Tue Nov 10, 2015, 3:03 pm

Can this school building apply for LEED for School?

Schools-2009 MPR3:Must use a reasonable site boundary
posted by  Leanne Niu  on 

There is a school building which has 5 floors, the project owner wants to do indoor decoration for only F1-F3 and the other two floor(F4-F5) will not be furnished.

1
Tue Nov 10, 2015, 11:15 am

O+M Starter Kit - Systems O+M Plan

NC-v4 INc1:Innovation
posted by  Kelsey Jensen  on 

Our firm is currently working with NC v3 LEED 2009 and we have never attempted the Systems O+M Plan before. Is there a more in depth template I am missing or is the starter kit the only resource?

1
Mon Nov 16, 2015, 3:10 pm

Excluding demand for occupancy sensors in retail sales area

CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controls
posted by  Eleftherios Zacharakis  on 

I have a retail store that the sales area is always occupied and therefore not on occupancy sensor. The sales floor is on a time clock instead. The rest of the store is on occupancy sensor.

1
Tue Nov 10, 2015, 4:48 pm

LEED Boundary adjacent to the Ocean

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Thomas Ehrnschwender  on 

Project is adjacent to the Atlantic Ocean. The sand dune is protected with many native plant species and a nesting habitat for 5 different endangered turtle species.