Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Definition of street frontage

Pilot-Credits PC14:Walkable Streets
posted by  Florian Schmidtchen  on 

What is the right definition of street frontage?

0

Rehabilitation of a historic building

NC-2009 PIf1:Minimum Program Requirements
posted by  Veronica Reed  on 

Hello we are working on a rehabilitation project for a small hotel being developed in an existing historic building in Quito, Ecuador.

0

Amphitheater Occupancy for SS and WE

General forums
posted by  Peter Doo  on 

Amphitheater Occupancy Project Location: United States Our project is the back stage area of a seasonal outdoor amphitheater concert venue.

0

Accounting for Shower Use by non-building occupants

EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by  Deborah Lucking  on 

We have a campus project where FTEs from a number of buildings have access to showers and lockers in a separate "clubhouse" building.

1
Tue Dec 1, 2015, 4:18 pm

Accounting for shower use by non-occupants

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Deborah Lucking  on 

Ours is a campus project where FTEs from a number of buildings have access to showers and lockers in a separate "clubhouse" building.

1
Mon Jan 4, 2016, 4:54 pm

Solar Tubes in Energy Pro

NC-2009 EAp2:Minimum Energy Performance
posted by  Logan Dorrell  on 

How would we model a solar tube light fixture in Energy Pro Software? We want to get the light thru it, but not the heat.

1
Thu Oct 1, 2015, 4:43 pm

How does GBCI ccalculate reclaimed water reduction?

NC-2009 WEc2:Innovative Wastewater Technologies
posted by  David Gibney  on 

This is an academic problem that I need confirmation for. It’s a LEED-NC 2009 project. • 242 FTEs. No visitors, etc. 50:50 gender ratio = 121 of each.

1
Fri Nov 27, 2015, 7:32 pm

IEQ 4.6

Schools-2009 IEQc4.6:Low-Emitting Materials—Ceiling and Wall Systems
posted by  Stephanie Santiago  on 

Where would joint compound be categorized? I don't believe it needs to be in the low emitting adhesives and sealants category but I could be wrong. I am currently classifying it under IEQ4.6.

1
Thu Dec 17, 2015, 1:13 am

Phasing Multiple LEED Projects

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Sara Zoumbaris  on 

We are working on a development where the project site is composed of two adjacent parcels of land.

0

Major renovation historic district includes off-site green area

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Veronica Reed  on 

Hello We are working on a major renovation project on a 1890's historic building in a very dense historic district.

1
Fri Nov 27, 2015, 5:44 pm