pressure drop adjustemnt in the baseline model
CS-2009 EAp2:Minimum Energy Performanceposted by Agnieszka Rylska on
I have two questiones: 1.
Green walls
NC-v4 WEc1:Outdoor water use reductionposted by Julien Richard on
Hi, Do we have to include green walls in the calculation ?
100% On site Infiltration
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Rodrigo Tonda on
Hello, we are working on a previously developed site with existing imperviousness less than 50% (Option 1, case 1).
Natatorium Locker Rooms
NC-2009 IEQp1:Minimum IAQ Performanceposted by Carl Karlen on
I am filing out the LEED documentation for IAQc1 for a Rec Center in St. Louis, MO. There is a Natatorium in this Rec with attached Locker/restroom/shower spaces.
Download Forms
NC-2009 PIf1:Minimum Program Requirementsposted by Ralph Bicknese on
Hello, I am currently working on a project in which we need independent specs for LEED and we are considering to facilitate the LEED forms to the Contractors so they can get familiar with them bef
Brownfield Documentation
NC-2009 SSc3:Brownfield Redevelopmentposted by Ivan Romero on
I've scanned the discussions on Brownfield and didn't see this addressed directly.
Accidentally Opened Awarded Credit during Appeal Stage
posted by Bernard Sagaiyaraj on
My team member accidentally opened 2 awarded credits during the Appeal Stage for some other non-compliance credits. No changes were made to the form.
Off-Site Solar Used to Power 100% of Building Electricity
CS-2009 EAc6:Green Powerposted by Heather South on
I am working on a LEED CS 2009 project and the owner of the building is building an off-site solar farm in a different town in the same state as the building he also owns and is going to be buildin
Electric Bike Storage
NC-v4 LTc6:Bicycle facilitiesposted by Irena Skoda on
Soon there will be a need to incorporate electric bikes and not just standard bike storage. Somewhat of a bigger space issue.
photocatalytic paint (TiO2) on Carpark Wall and Ceiling
CS-2009 IDc1:Innovation in Designposted by Wing Ho on
Our client is considering to apply photocatalytic paint (TiO2) on the project carpark wall and ceiling to reduce the NOx level and air pollutant.