School Facilities
CI-2009 SSc2:Development Density and Community Connectivityposted by Neil Rosen on
Can the athletic fields, tennis courts etc at a local high school be considered a park under CI V3 SS C2 - Community Connectivity?
Addressing Only Portions of Credit Requirements
EBOM-2009 MRp1:Sustainable Purchasing Policyposted by Michelle Rosenberger on
I have received a review comment on MRpr1 that indicates that I only addressed "a portion" of the credit requirements for MRc1, 2 and 3 and need to address the full credit. I am confused.
Inventory vs Plan
EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lampsposted by Michelle Rosenberger on
This credit talks about a purchasing plan but uses an inventory in lieu in the documentation.
How FINAL is the Appeal?
posted by Mary Kay on
EAp2 was denied in our final design review. We are going to appeal this by addressing their comments and getting the energy savings above 10%. My question is, IF the appeal is denied, what then?
Existing Central Plant and New building
NC-2009 EAp2:Minimum Energy Performanceposted by Mital Patel on
We have a new building but with existing central plant that serves also another building. My question is do i have to model part of existing central or whole.
Green Cleaning in a Fab
NC-2009 IDc1:Innovation in Designposted by David Gibney on
I'm working on a semiconductor fab that is part of a LEED campus project. The campus has a well-established, campus-wide green cleaning program in place.
No irrigation for pre-req
NC-v4 WEp1:Outdoor water use reductionposted by Robyn Dowsey on
I have two turf areas that will not be irrigated after establishment My understanding is that for the water sense calculator you must model them with irrigation is they are landscaped Is this true
Mixed-use Building
CS-2009 SSc9:Tenant Design and Construction Guidelinesposted by Wan Ji Loo on
Hi, my project is a mix use building with two buildings connected via a commercial area below, a residential and hotel in one block and a office tower in the other.
"Preserve from development activity 40% of the greenfield area"
NC-v4 SSc2:Site development - protect or restore habitatposted by Natalie Otoole on
Our 5 acre site has no greenfield area- we are demolishing the entire site and will restore with some green space/vegetation after construction.
Apparatus bay of Fire Department
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Laura Charlier on
HI there, Would the apparatus bay of a fire department need to be included in the building flush-out? I see a typical garage would not need to be included but this isn't a typical garage.