Forum quick links
Scope of landlord change
CI-2009 WEc1:Water Use Reductionposted by Graham Langton on
Within our CI project (Office - 5 stories), there are landlord core areas including all toilets / washing facilities (same toilet block repeated on each floor).
Water calculator
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Maria Rozatti on
There is somewhere a guide or guidance for completing the 2009 Water Use Reduction Calculator?????
Service life of a piece of HVAC equipment?
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Rosemary Ziemann on
The link above for the 2007 ASHRAE Applications Handbook, HVAC Applications seems to be broken.
Missing: Design/Construction designation & "ready for review"
posted by Teresa Stern on
Our project was changed over to LOL v4 but there are no designations for Design vs Construction credits.
DES heating and cooling plant using a unique heat pump
posted by Elodie DUMAS on
Hi We work on a project pursuing Leed C&S 2009 certification in France.
Tree grates
CS-2009 SSc7.1:Heat Island Effect—Nonroofposted by sue bryant on
Can the metal grates used where trees are planted in a hardscape count as open paver area [as long as the 50% open grid is achieved]?
ADA Parking Exclusion
CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Daniel Joseph on
Can we exclude ADA parking from the total parking capacity when considering the preferred parking 5% max?
LEED CI Regional Priority Documentation
CI-2009 RPc1:Regional Priorityposted by Bethany Beers on
It's not clear to me where to document the points for RPC's. At the end of each template, there is a check box for ID points, but nothing for RPC points.
Cooling tower cycles
Pilot-Credits WEpc17:Cooling tower water useposted by Phuc Do on
Hi all, Our project is using Munters cooling tower in which the cooling tower cycles measured continuously and the dump cycle adjusted accordingly.
PAUs not serve the occupied areas
NC-2009 IEQp1:Minimum IAQ Performanceposted by study topenergy on
A data center is applying for LEED-NC v2009. There are 5 PAUs (Primary Air Unit). 4 of them will serve the equipment rooms. One will serve the equipement rooms and office areas.