Forum quick links
Relocation of existing trees within site
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Yiwei Koh on
Hi, A project I am working on has some existing mature trees, there are intention to relocate the trees within the site. In this case, how can i account this under SSc5.1?
LEED documents
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Olga Kim on
Good afternoon all, I have a question about LEED certification. We produce high quality water basied paints in Kazakhstan. Our products are certificated by Kazakh Certification Center.
BD+C Major Renovation or O+M Existing Buildings
posted by Catherine Verdier on
Hello, The project I am working on is an existing office building, that will undergo renovation works and will have its entrance hall extended (the extension will be a little more than 1,000 sf).
M&V Plan
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Akshay Odugoudar on
Does the M&V Plan for EAc5.2 have to include what tool is being used to calculate the baseline energy use of the building?
PPM versus other units of measurement
Pilot-Credits EApc66:Community contaminant prevention - airborne releasesposted by Jennifer Berg on
The current credit uses ppm units for all equipment. This is not a common measurement used or documented for generators.
Structurally Independent Garage - which credits to consider?
Healthcare-v2009 SSc7.1:Heat island effect - nonroofposted by Iris Amdur on
Hello, Firstly, Tristan or Susan, if you guys think that I would be better served putting this comment under another credit, please let me know..
Volume Captured on the Stormwater Mgmt Calculator
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Kimberlee Dobbins on
Going from LEED-EB 2.0 SS credit 5.1 to LEED 2009, O&M, what is the number for "Volume Captured"?
LEED BD+C 2009 vs v4
posted by MARIA FERNANDA VILLANUEVA RAMOS on
Hi, I'm working on the certification of a high school, it would be my first certification. I became a LEED AP BD+C with the v4, but I have been reading that almost all the projects get certified wi
Leased off-street parking spaces
NC-v4 LTc7:Reduced parking footprintposted by Alicia Villanueva on
Hi! We are working on a project that does not provide any off-street parking on site but parking spaces for employees are leased from 3 nearby parking garages.
Supplemental Guidance to the MPR for LEED v4
NC-v4 MPR1:Must be in a permanent location on existing landposted by SoYoung Lee on
It seems to me that the MPR guidance for LEED v4 does not sufficient to comprehend the project specific features.