Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

How to apply base ratios for non-specified usage type?

CI-v4 LTc5:Reduced parking footprint
posted by  Jonathan Weiss  on 

For a laboratory / office building, how do you apply the baseline? It appears that you pro-rate the usage by area of each space type, but laboratories are not a listed usage type.

1
Thu Sep 7, 2017, 4:17 pm

Account for local and utility central energy plants

NC-v4 EAp2:Minimum energy performance
posted by  S. Sachs  on 

We are building an addition to an existing building that has a central plant that is outside of our LEED boundary. However, we also have a contract to improve the performance of the central plant.

1
Wed Apr 26, 2017, 10:49 pm

Quality Assurance

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  Ciaran McCabe  on 

Can anyone help with the following LEED reviewer comment that we received.

1
Thu Apr 27, 2017, 1:08 pm

LEED V4 -Healthcare Or NC

LEED Rating System Selection
posted by  DON JUNIOR  on 

I am part of a team, trying to decide on which rating system to use for a new construction project. Our project is a hospital outside US (located in Middle East).

1
Fri May 5, 2017, 4:28 pm

Conditions for site fence

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Julian Bork  on 

Hello everybody I have a question about the construction fence as a part of the ESC plan: is there a minimum height for closing or covering the fence with tarpaulins to avoid wind erosion? Many th

1
Sat Aug 26, 2017, 2:12 pm

Projects constructed by diferent owners, same property managment

LEED Guidance for Campuses and Multiple Buildings
posted by  Pedro Urazan  on 

Hi, A land owner wants to develop 2 buildings in a section of his terrain and wants to sell the rest of the parcels.

1
Fri May 5, 2017, 10:07 pm

Increasing certification level after accepting certification?

General forums
posted by  Tommy Linstroth  on 

Is it possible to improve your certification level after accepting final certification?

1
Thu Apr 27, 2017, 8:58 pm

"Categorized as an Office Space"

CS-2009 EAc1:Optimize Energy Performance
posted by  Aaron Frantz  on 

We are proposing a new mixed use multi-story to be submitted under NC, v2009. The first floor will be cold dark shell space for future retail/restaurant tenants.

1
Mon May 1, 2017, 1:49 pm

IAQ calculator v03

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Izabela Kwiecinska  on 

The new calculator (v2009v4_Minimum IAQ Performance Calculator_v03) from the Resources tab, does not count the ‘Zone Outdoor Airflow’ (column N) and it shows 0,00 no matter what system and values w

1
Mon Jul 10, 2017, 10:46 am

Documentation

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Saif Abdulameer  on 

Hello everyone, I am working on the documentation of a Multi zone project for the cooling conditions in this case should the "Zone Primary Air flow Vpz" be equal to the "Zone Discharge Airflow Vd

1
Fri Apr 28, 2017, 2:49 pm