Log in
Forum » NC-v4 MRc5
Topic

Option 2- Based on GSF, excluding garage area but including garage CDW?

NC-v4 MRc5: Construction and demolition waste management
posted by Michelle Bombeck on Oct 15, 2018, 8:02 pm

It appears that the for Option 2, teams must calculate the total waste generated for the project which might include construction of a garage or other site feature that would not be included in...

Last reply: RETIRED, Jan 21, 2019, 5:25 pm

Reporting Clarification for Waste Hauler/Transfer Station

NC-v4 MRc5: Construction and demolition waste management
posted by Melissa Johnston on Jan 3, 2018, 2:39 pm

forums have a lot of answers to common questions. I've referenced a few current links below but consider using the powerful new search function in https://leeduser.buildinggreen.com/forums?f%5B0%5D=im_field_credits%3A867 as well as for LEED v4 (https://www.usgbc.org/node/2601020?return=/credits).  And lastly please also be sure to fully explore all the tabs in the LEED Credit Library. See...

Last reply: RETIRED, Oct 29, 2018, 5:42 pm

Overall Project transperancy solutions and the difficulty or concerns with certain materials (IMP)

NC-v4 MRc5: Construction and demolition waste management
posted by Olawale Taiwo on Aug 24, 2018, 10:58 am

Background Information:

Insulated metal panels (IMP): These products, though very viable as per speed and quality of construction assemblies are difficult to trade off for...

Last reply: Olawale Taiwo, Aug 28, 2018, 11:17 am

Regulation of commingled recycling facilities

NC-v4 MRc5: Construction and demolition waste management
posted by Keith Winston on Sep 22, 2016, 7:36 pm

https://www.usgbc.org/credits/new-construction-core-and-shell-schools-ne.... Check out the LEEDuser forum- https://leeduser.buildinggreen.com/credit/Pilot-Credits/MRpc87. You might also read- https://www.recyclingcertification.org/certified-facilities/.) If your contracted...

Last reply: RETIRED, Aug 24, 2018, 8:41 am

NC-v4 MRc5 Option 2: Clarification of floor area for multi-phase renovation project.

NC-v4 MRc5: Construction and demolition waste management
posted by Yasha Ogg on Apr 11, 2018, 8:41 am

RETIRED LEEDuser Expert 623 thumbs up April 11, 2018- 9:23 am Yasha- I am answering this post with identical text as was posted under https://leeduser.buildinggreen.com/forum/commingled-waste-one-or-multiple-material-streams#comment-52096. The area for Option 2 would be the entire renovated space area (which is the same area you use for the Gross Floor Area in Project Details in LEED Online (See the Details tab)).  You will save and submit all your documentation for this credit at the end of all phases. Your calculation will be based on the overall waste for all phases divided by the entire renovated space's area. Log...

Last reply: RETIRED, Apr 11, 2018, 9:23 am

MR- Construction and Demolition waste Management: Group Approach

NC-v4 MRc5: Construction and demolition waste management
posted by MAUDE PINTAL on Mar 28, 2018, 10:54 am

RETIRED LEEDuser Expert 623 thumbs up March 29, 2018- 2:08 pm Maude- The Group and Campus Approaches outlined in the Reference Guide refer to multiple buildings being LEED certified at the same time. See page 10 of the BD+C Reference Guide (Projects Using Campus Certification) for more information. It does not include both LEED and non-LEED projects; however, I'm not an expert on Campus and Multiple Building certifications. I would suggest looking at these existing LEEDuser forums related to this topic-   https://leeduser.buildinggreen.com/forums?f[0]=im_taxonomy_forums:4813  - and seeing...

Last reply: RETIRED, Mar 29, 2018, 2:08 pm

Brick and rubble in soil

NC-v4 MRc5: Construction and demolition waste management
posted by Marilyn Specht on Mar 9, 2018, 11:27 am

forums. Log in or register to post comments ...

Last reply: RETIRED, Mar 12, 2018, 1:59 pm

Demolition includes Mechanical and Electrical equipment

NC-v4 MRc5: Construction and demolition waste management
posted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on Mar 5, 2018, 5:48 pm

Assume a building to be demolished has large HVAC equipment and electrical gear, etc., and is not being reused but discarded. How would these be included and documented in CWM tracking? Would...

Last reply: Renee Shirey, Mar 6, 2018, 10:16 am

Applying Facility Averages to Commingled Streams

NC-v4 MRc5: Construction and demolition waste management
posted by Ben Austin on Jan 25, 2018, 5:04 pm

The following are the waste streams that are being collected on the project site:

     - Wood

     - Metal

     - Concrete

     - Cardboard

     - Commingled...

Last reply: RETIRED, Jan 26, 2018, 11:04 am

More Than One Commingled Waste Hauler on a Job- 2 Streams?

NC-v4 MRc5: Construction and demolition waste management
posted by Patty Lloyd on Jan 22, 2018, 3:26 pm

Hi, if a project has a demolition subcontractor who hires a...

Last reply: RETIRED, Jan 22, 2018, 5:25 pm