Forum quick links
Construction and Demolition Waste Management Plan – Sample
CI-v4 MRc6:Construction and demolition waste managementposted by milo valenti on
Construction and Demolition Waste Management Plan – Sample Are there template sample form in Excel format for our recycling yard?
Schools - 2009 IEQp3 - STC requirement between Computer Lab and Elevator Shaft
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by Todd Bundren on
Does anyone know what the STC requirement is for a partition that separates a computer lab and an elevator shaft?
Eap2-c2 Group ceritification energy modeling
CS-v4 EAp2:Minimum energy performanceposted by FABIO VIERO on
Hi,
Intermittent ventilation
NC-v4 EQp1:Minimum indoor air quality performanceposted by Dustin Smith on
Has anyone successfully used scheduled intermittent ventilation for a constant-volume exhausted space to avoid overventilation, and to minimize energy usage, in a warehouse or similar space?
SD Leaders 2019 Salary Survey
posted by RoseAnn Grimes on
It’s here! By popular demand we’re re-running the SDL Salary Survey that we last ran in 2015.
Default occupancy for Transportation Terminal
NC-v4 WEp2:Indoor water use reductionposted by Ricardo Sá on
Hi,
2018 Summer SDL Summit - A few spots still available
posted by Jerelyn Wilson on
There are a few spots left for the 2018 Summer Architecture + Design Sustainable Design Leaders Summit that is being held August 1-3 at the Garrison Institute in Garrison, NY (Easy train ride from
Full annual simulation - 365 days only?
NC-v4 EQc7:Daylightposted by Anna Korinkova on
Hello,
I would like to clarify what exactly is meant by 'full annual simulation' for the sDA and ASE (Option 1 of the credit).
Applying MRp2 retrospectively
NC-v4 MRp2:Construction and demolition waste management planningposted by André Harms on
A potential LEED project in Addis Ababa, Ethiopia, had already begun demolition and some construction activities before a LEED AP was appointed.
waste generated from new construction
Mid-Rise-v4 MRc3:Construction waste managementposted by sue bryant on
If you are removing an existing building, can the waste from the building be counted if you are recycling it?