Forum quick links
Option 1
Pilot-Credits PC12:Reduced Automobile Dependenceposted by Jun Hashimoto on
I completed option 1. My LEED-CI project is a confidential project, but is located in a dense urban area with well-developed public transportation.
I was under the impression
posted by Bill Swanson on
I was under the impression from Chrissy Macken from USGBC during the first public comment phase that all aspects of LEED were up for comments. My suggestion to revise the BUG lighting system in th
LEED CS 2009 LEED ENERGY MODEL
CS-2009 EAc1:Optimize Energy Performanceposted by John Harrington on
My proposed system is a WSHP.
is a closed landfill automatically a brownfield?
NC-2009 SSc3:Brownfield Redevelopmentposted by Amanda Redmond-Neal on
My project is to be built on top of a landfill that was closed in 1961.
Region Where LT Leases are NOT Common
CI-2009 MRc1.1:Tenant Space—Long-Term Commitmentposted by Raymond Loo on
Has anyone in a region where long term contracts are not common, had experience (of if you have any comments) dealing with USGBC on this credit?
Ventilation Rate Schedule sample
NC-2009 IEQp1:Minimum IAQ Performanceposted by Nelina Loiselle on
You should update this sample under your rescources section to one that includes an Ev rate.
Reclaimed Mahogany on Homes Project
posted by anastasia harrison on
Is it permissible to use a reclaimed mahogany door that is not FSC on a project? It was manufactured for a different home, installed and quickly changed.
Equivalent to Green-E
CI-2009 EAc4:Green Powerposted by Wayne L. Appleyard on
Has anyone defined this? We are looking at purchasing RECs directly from one or more schools or other non-profits that have not sold RECS.
Rating system for high-rise residential
posted by Melissa Merryweather on
My client requested to use Core and Shell; 80% of the buildings will be apartment units for sale with up to 20% retail space for tenant lease and fit-out.