Overlapping LEED boundaries-connecting new to existing LEED BLDG
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Punit Jain on
I am working on a LEED certification for a new building that is attached via a small circulation bridge to an existing LEED-Certified building on a college campus.
CFS-TTS Firestop Top Track Seal
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Celimar Fournier on
We are currently using the Hilti CFS-TTS Firestop Top Track Seal for one of our projects. The VOC Content is 22g/l. Under what category should I enter this product for IEQ c4.1?
TPO Roofing
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Celimar Fournier on
Are roofing materials part of this credit? Do I need to take into consideration the VOC Content of the TPO Bonding Ahesive, TPO Cut Edge Sealant, TPO Primer and the TPO Seam Cleaner?
Controls in individual occupant spaces
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by VEL MUTHU on
I am working on a project where i have a control room to monitor the users activities for security purpose. There are 7 seats.
EPDs and Manufacturing Dates
CI-v4 MRc3:Building product disclosure and optimization - environmental product declarationsposted by Michelle Rosenberger on
Does an EPD need to be issued before the manufacturing date of the product installed? Or do we just need to provide an EPD for that product when we submit for certification?
Documenting thermal comfort controllability.
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by VEL MUTHU on
I am working on a project where i have retail units in a big building which serves the building users. These retail units will be rented so we are not sure how the seat arrangements are.
SRI Non-roof
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by MARIA ESTHER LAMADRID on
Hello, does anyone know if it is aceptable to use sri values of concrete from the guide for a crusher fine concrete or it need a test to be accepted? Thanks
About disturbance considerations for retention walls.
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Mauricio Ramirez on
Hi everyone: I have a Project that needs to have large retention walls close to the office and main acces road.
CO Sensors in Multi-Family Highrise
NC-v4 EQp1:Minimum indoor air quality performanceposted by Jennifer Rennick on
For a Multi-Fam Highrise, the corridors will be heated with a ducted roof-top gas furnace split dx system will be installed.
Campus Credit - Landscape
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by SAMY Chamy on
Our Project is a Campus Project with 4 registered buildings for LEED. The ground cover landscape didn't not meet the SS C5.1 requirement. So we opted for Roof Garden on one of the buildings.