Forum quick links
Reclaim land for more than 40 years
NC-v4 MPR1:Must be in a permanent location on existing landposted by Michael Wahjudi on
"All LEED projects must be constructed and operated on a permanent location on existing land" from these statement.
Is it ok to take out charge for changing facilities?
CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Maria Glädt on
Hi! Our project, an office building, will have the changing facilities adjacent to a gym. The tenant will take out a small charge from the workers for usage of the gym.
Old concrete
CS-2009 SSc7.1:Heat Island Effect—Nonroofposted by Maria Glädt on
Hi! Our project is a renovation project on a site with old concrete stones. Is it ok to document count with the SRI for new concrete? How shall it be documentet?
Old sheet metal on roof
CS-2009 SSc7.2:Heat Island Effect—Roofposted by Maria Glädt on
Hi! The roof of our renovation project has is made of old sheet metal, which we do not know the SRI of.
#45 - Innovation or Pilot Credit
Pilot-Credits SSpc45:Site assessmentposted by Alicja Bieszyńska on
I noticed USGBC information "This pilot credit was closed to new pilot credit registrations on 3/1/2015.
Place of respite for staff
Healthcare-v2009 SSc9.1:Connection to the natural world - places of respiteposted by Gustavo De las Heras Izquierdo on
It is not clear to me if the place of respite for the staff must also meet all the requirements listed in the credit.
Sixth grade level height
Healthcare-v2009 SSc9.1:Connection to the natural world - places of respiteposted by Gustavo De las Heras Izquierdo on
The FGI Guideline Section 1.2-6.3c recommends to install signage at sixth grade level. Does anyone know what it means?
Dynamic Plaque for ID: Green Education
posted by Jennifer Preston on
Has any Project Team achieved the ID: Green Education credit with the LEED Dynamic Plaque satisfying requirement #1: "Comprehensive signage program built into the building's spaces to educate the
satisfaction surveys - Ergonomics strategy
Pilot-Credits EQpc44:Ergonomics approach for computer usersposted by Jean-Baptiste SARFATI on
Are there standardized satisfaction surveys for ergonomics workstations in a store ? We would like to evaluate METWAs, furnishings, and accessories to ensure they continue to meet the diversity of
Confused about credit title
Pilot-Credits MRpc52:Material multi-attribute assessmentposted by Jody Lee Potvin-Jones on
Is MRpc52: A) "Material multi-attribute assessment", as stated under credit language or B) "Environmentally preferable non-structural products and materials: perscriptive attributes"