Forum quick links
Change in Ownership affecting Green Power Contract?
CS-2009 EAc6:Green Powerposted by Joern Drosten on
Dear all, the company which does the site development of our project has entered a two-year power contract (100 % green power).
MR Credits on Loe-Emitting Materials
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Greengrade User on
Does this require testing after it is in place?
Different commencements of green power contract and biogas CHP
CS-2009 EAc2:On-site Renewable Energyposted by Joern Drosten on
Dear all, our project will get a biogas CHP plant and we are also targeting EAc6 (Green Power) with exemplary performance.
Commissioning of Process Equipment
CI-2009 EAc2:Enhanced Commissioningposted by Graham Langton on
'Commissioning is required for all systems and equipment installed as part of the tenant’s project scope'...
VAV box serving multiple space types
NC-2009 IEQp1:Minimum IAQ Performanceposted by Mike Fortier on
One of my project's multi-zone systems has a single VAV box serving multiple space types (corridor, storage, office). What is the best way to approach this scenario in the 62MZ calculator?
Network Area
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Greengrade User on
In LEED 2009 does it include a bicycle network plan as part of the credit?
Wood/Metal Shop
Schools-2009 IEQc7.1:Thermal Comfort—Designposted by Dan Forino on
Has anyone been able to achieve this credit in a ventilated, but not conditioned Wood/Metal shop.
Homers energy efficiency in Central America
ND-v2009 GIBc2:Building energy efficiencyposted by Jose Ng on
Hi leeduser team: For countries with tropical climate without certification systems of energy efficiency (for homes).
Stripper/Cleaner for Paint preparation - under "Other?"
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Heather DeGrella on
I am helping a manufacturer of a zero-voc Concrete Cleaner/Stripper that is used for preparing concrete for painting figure out how the product fits into LEED.
Signatory Statement and Signage
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Daniel Garavito on
We are currently working in a project located in New York City. The owner owns the entire floor where the project is located.