Topic | Recent |
---|---|
Pilot- No Cooling TowerNC-v4 WEc3: Cooling tower water useposted by Martin Meehan on Nov 30, 2017, 12:17 pm
Hello I am working on a project that includes 3 baseline energy systems, one of which is System 7. To qualify for the pilot, it is enough to ensure that System 7 is included as part... Last reply: Ben Stanley, Jan 11, 2018, 3:54 pm |
|
Recycled non-potable water measurementNC-v4 WEc3: Cooling tower water useposted by Elizabeth (Zeba) Floyd on Dec 11, 2017, 2:54 pm
Our intention is to... Last reply: Ben Stanley, Jan 11, 2018, 3:21 pm |
|
No cooling tower- District coolingNC-v4 WEc3: Cooling tower water useposted by Martina Salonen on Aug 23, 2017, 8:16 am
Hello! We have project which would be applicable for the 'no cooling tower' alternative compliance credit. However, the client is now considering connection to the district cooling system. Do I... Last reply: Martina Salonen, Oct 31, 2017, 4:56 am |
|
No Cooling Tower- Alternative Compliance PathNC-v4 WEc3: Cooling tower water useposted by Kristina Pobre on Jun 2, 2017, 4:35 am
My project does not have a cooling tower. One of the ACP eligibility condition is: "the baseline system designated for the building using ASHRAE 90.1-2010 Appendix G Table G3.1.1 includes a... Last reply: Ben Stanley, Aug 29, 2017, 11:12 am |
|
Campus Cooling TowerNC-v4 WEc3: Cooling tower water useposted by Brightworks Sustainability on Dec 20, 2016, 6:34 pm
My project is not installing a cooling tower, but they will utilize the shared existing campus cooling tower. Can we achieve this credit with the campus-wide cooling tower, if it complies with... |
|
Which parameters of the cooling tower?NC-v4 WEc3: Cooling tower water useposted by Jade Deltour on Oct 22, 2015, 8:27 am
Which parameters/performances of the cooling tower need to be checked/optimised to limit tower cycles to avoid exceeding maximum values? |
|
Is there a timeframe for the minimum number of cycles?NC-v4 WEc3: Cooling tower water useposted by Gregory Martin on Sep 10, 2014, 4:02 pm
I am working on a presentation to educate my office on Lv4. This being a new credit I don't think I am totally understanding the requirements. The guidebook states "limit tower cycles to avoid... |
|
No cooling towerNC-v4 WEc3: Cooling tower water useposted by Maria Porter on Nov 26, 2013, 8:14 am
If you have no cooling tower, do you automatically get the point or you are not eligible for the credit? |