Forum quick links
Is janitor closet water use considered as Process Water and need to be measured apart of domestic fixtures piping?
NC-v4 WEp3:Building-level water meteringposted by Mauricio Toro on
We have been receiving comments from the LEED reviewer team asking for information to confirm that the non-fixture usage (e.g.
Bird Collision Monitoring frequency
Pilot-Credits SSpc55:Bird collision deterrenceposted by Jay R on
Hello,
Electrical service requirement for dual port Level 2 chargers
CS-v4.1 LTc8:Electric Vehiclesposted by Natalie Terrill on
The current language requires a Level 2 charging capacity with 208-240 volts or greater for each space.
Recycling Rates
Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by Stephanie Graham on
Under Credit-Specific Documentation it says, "Recycling rates applied to a project's waste generation must be the weighted average for the facility over the time in which the project sent materials
LEED v4.1 status
posted by Nermin Hegazy on
Is LEED v4.1 officially published or is it still in Beta stage?
Lighting control for hotel lobby, bar, restaurant
Hospitality-NC-v4 EQc6:Interior lightingposted by Giuseppina Amorusi on
Good morning
I have a question relating lighting control in a hotel building.
HVAC system within the scope of tenant
CS-v4 EAp2:Minimum energy performanceposted by Ashish Nautiyal on
Hello All,
Furniture and Medical Furnishing (product sourced -160Km)
Healthcare-v4.1 MRc7:Furniture and Medical Furnishingsposted by Maria Kordjamshidi on
I am woundring if the product sourced is not in 160 km of the project, no point will be assigned to the project from MRC7?
Fire alarm cables (Public Address system) in the hospitals
Healthcare-v4 MRc6:PBT source reduction - lead, cadmium and copperposted by Najam Us Saqib on
Fire alarm cables are same like electrical cables, however, its function is different.