Forum quick links
Voltage Drop // mandatory provisions ASHRAE 90.1 - 2010 - ADDENDA 10218
NC-v4 EAp2:Minimum energy performanceposted by Sara BENLOUBA on
Hello everybody,
We are working on a project under LEED V4 certification.
Lighting Power Density in LEED v4.1 MEPC Calculator
NC-v4.1 EAp2:Minimum Energy Performanceposted by Gopinath Vasu on
Hi,
I have a question in LEED v4.1 Minimum Energy Performance Calculator.
Partial use of Plant equipment for LEED certification
NC-v4 EAp2:Minimum energy performanceposted by Vassil Vassilev on
Greetings,
No cooling tower - ACP
NC-v4 WEc3:Cooling tower water useposted by Charalampos Giannikopoulos on
Hi all!
Ending the SAL experiment
posted by Nadav Malin on
Hi SAL friends,
As some of you have heard by now, we've decided to shut down this Peer Network.
Scope 1 vs Scope 3 Fuels
posted by Geoffrey Brock on
Hi folks, I was asking around during Greenbuild and getting a variety of answers on this, and since our Contractor Commitments make a distinction between "GC's" mobile equipment as scope 1 and "Sub
Proposed interior lighting power allowance
NC-v4 EAp2:Minimum energy performanceposted by Ricardo Sá on
Hello,
Table 6.5.3.1.1A Maximum allowed fan power
CS-v4 EAc2:Optimize energy performanceposted by Sarah Leenknegt on
Hi
Frequency of inspections
NC-v4 SSp1:Construction activity pollution preventionposted by Maria Porter on
We got a review comment: “Provide additional documentation to confirm that the project meets the requirements for reductions in inspection frequency (Section 4.1.4 of the EPA Construction Gener