Topic | Recent |
---|---|
Existing CanalNC-v4 SSc4: Rainwater managementposted by Heather Appell on Dec 26, 2018, 11:51 am
Can this credit be achieved if some of the rainwater collection is filtered into a canal bordering the project site? TIA! |
|
Master site development considerationNC-v4 SSc4: Rainwater managementposted by soha yamani on Nov 19, 2018, 1:12 am
Greetings , in LEED V4 there was an approach where I can use a master plan rain water management system . I can not find this option in V4 , I am working on a project that is part... Last reply: Dustin Norton, Dec 6, 2018, 9:22 am |
|
GreenroofsNC-v4 SSc4: Rainwater managementposted by Ricardo Sá on Nov 29, 2018, 10:26 am
Hi, We are using the "Small Storm Hydrology Method" to calculate runoff volume and using the Rv based on impervious area. The questions are: 1) How shall a greenroof... Last reply: Michael DeVuono, Dec 6, 2018, 9:11 am |
|
Airport-Terminal- Runways must be included at the calculations?NC-v4 SSc4: Rainwater managementposted by Konstantina Kalliakoudi on Dec 6, 2018, 8:49 am
I have a project that is an Airport Terminal. The Leed boundary includes the runways. Concerning the Credit "Rainwater management": Do the runways participate at the calculations? Is there a... Last reply: Michael DeVuono, Dec 6, 2018, 9:05 am |
|
Option 2- Natural HydrologyNC-v4 SSc4: Rainwater managementposted by Michelle Rosenberger on Aug 3, 2017, 2:15 pm
We are confused by the vagueness of these requirements. Our site has assessed all possible LIDs, and the civil has determined that the site is unsuitable for any such measures due to high water... Last reply: Laura Cuccaro, Oct 10, 2018, 1:43 pm |
|
USGBC rainfall events calculatorNC-v4 SSc4: Rainwater managementposted by Leanne Niu on Nov 29, 2017, 11:01 pm
We could not get the 10 years of the historic daily rainfall data, if we could leave the sheet of historical data blank? and how we calculate the total runoff we need to control on site? Last reply: Olga Yuil, Sep 17, 2018, 1:59 pm |
|
Rainwater treated in high performance rain gardens and runoffNC-v4 SSc4: Rainwater managementposted by Nita Christopher on Sep 6, 2018, 10:36 am
Project team has selected Option 2 of Rainwater Management Credit. Site is 3.85 acres. Geotech report indicates underlying soils to be clays with little to no... Last reply: Michael DeVuono, Sep 6, 2018, 10:55 am |
|
Rainfall Data – Bangladesh.NC-v4 SSc4: Rainwater managementposted by Prakash Sekar on Sep 5, 2018, 2:56 am
One of our projects in Bangladesh is going for LEED V4 NC rating, we currently have Average Rainfall data for Dhaka, Bangladesh if we calculate with the average rainfall data tank capacity... |
|
Precipitation informationNC-v4 SSc4: Rainwater managementposted by Carmen Soraya Agudelo on Jun 13, 2018, 4:12 pm
Hi, I am not able to find the 10 years or more precipitation for a site in Alabama. Can somebody has the NOAA link where I can get these precipitation data? Last reply: Ryan Hughes, Aug 17, 2018, 12:36 pm |
|
Manage Runoff from Entire Site RequirementNC-v4 SSc4: Rainwater managementposted by Karina Lairet on May 23, 2018, 7:30 pm
Per the USGBC Guide, it says that the project must manage rainwater runoff from the entire site within the project boundary. My project is a high rise building in downtown San Francisco, and it ... Last reply: Michael DeVuono, May 24, 2018, 11:11 am |