Forum quick links
post on older LEED-HC forum
Healthcare-v2009 MRc5:Furniture and medical furnishingsposted by Tristan Roberts on
Before LEEDuser set up these credit-specific Healthcare forums, there was a general Healthcare forum on which this MRc5 question was posted. I am reposting the Q&A here for convenience:
here is another post from the older LEED-HC forum
Healthcare-v2009 MRc4.2:PBT source reduction - lead, cadmium and copperposted by Tristan Roberts on
Q: In regards to the following statement, as part of the MRc4.2 requirements:
repost from older HC forum
Healthcare-v2009 IEQp1:Minimum indoor air quality performanceposted by Tristan Roberts on
Before LEEDuser set up these credit-specific Healthcare forums, there was a general Healthcare forum on which this IEQp1 question was posted. I am reposting the Q&A here for convenience:
Projects boundaries in campus and LED site lights with OC sensor
posted by Saju Varghese on
We are currently having a campus containing 11 buildings/structures out of which, 6 are going to be LEED certified.
Too many densely occupied spaces
CI-2009 IEQc1:Outdoor air delivery monitoringposted by Rubén M. R. on
Hello everyone, I am working on a three-level commercial office project.
Heating setpoint - no heating system
NC-2009 EAp2:Minimum energy performanceposted by Luana Bertoletti on
Hi, I have a doubt on how to establish the heating setpoint for an HVAC system which has no heating system. In a specific project, I have only cooling system serving conditioned areas.
Equipment discrepancy for Owner's project requirements vs. Model
CS-2009 EAp2:Minimum energy performanceposted by charles bell on
Our Campus Application CS mixed use/office project uses a common HVAC (district energy) system. The Owner's program required 100 s.f. per ton for the retail areas and 300 s.f.
Ballast
Retail-CI-v2009 EAp2:Minimum energy performanceposted by John Kitsalis on
Hello, My question concerns the topic of Watts per luminaire. I am to determine how many Watts there are per luminaire.
Baseline Building Equipment Capacity
NC-2009 EAp2:Minimum energy performanceposted by Kai Andrade on
When modeling the Baseline Bldg, where is the best place to add the 15% safety factor for cooling that is allowed by G3.1.2.2?
no. of auditors
EBOM-2009 IEQc3.2: Green cleaning - custodial effectiveness assessmentposted by Katherine Ann Resurreccion on
Should the audit be strictly performed by only two (2) individuals then average their scores? Or it can be three or more?