Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Construction and Demolition Waste Management Plan – Sample

CI-v4 MRc6:Construction and demolition waste management
posted by  milo valenti  on 

Construction and Demolition Waste Management Plan – Sample Are there template sample form in Excel format for our recycling yard?

3
Default Avatar
Green Building Consultant
LEEDuser Basic Member
20 thumbs up
Tue Jan 22, 2019, 7:51 pm

Schools - 2009 IEQp3 - STC requirement between Computer Lab and Elevator Shaft

Schools-2009 IEQp3:Minimum Acoustical Performance
posted by  Todd Bundren  on 

Does anyone know what the STC requirement is for a partition that separates a computer lab and an elevator shaft?

0

Intermittent ventilation

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Dustin Smith  on 

Has anyone successfully used scheduled intermittent ventilation for a constant-volume exhausted space to avoid overventilation, and to minimize energy usage, in a warehouse or similar space?

0

SD Leaders 2019 Salary Survey

SD Leaders
posted by  RoseAnn Grimes  on 

It’s here! By popular demand we’re re-running the SDL Salary Survey that we last ran in 2015. 

0

2018 Summer SDL Summit - A few spots still available

Green Commons
posted by  Jerelyn Wilson  on 

There are a few spots left for the 2018 Summer Architecture + Design Sustainable Design Leaders Summit that is being held August 1-3 at the Garrison Institute in Garrison, NY (Easy train ride from

4
Partner, Sustainability Director
WRNS Studio
LEEDuser Basic Member
0 thumbs up
Tue Jan 22, 2019, 5:23 pm

Full annual simulation - 365 days only?

NC-v4 EQc7:Daylight
posted by  Anna Korinkova  on 

Hello, 
I would like to clarify what exactly is meant by 'full annual simulation' for the sDA and ASE (Option 1 of the credit).

1
Wed Jan 23, 2019, 3:12 pm

Applying MRp2 retrospectively

NC-v4 MRp2:Construction and demolition waste management planning
posted by  André Harms  on 

A potential LEED project in Addis Ababa, Ethiopia, had already begun demolition and some construction activities before a LEED AP was appointed.

1
Tue Jan 22, 2019, 8:00 pm

waste generated from new construction

Mid-Rise-v4 MRc3:Construction waste management
posted by  sue bryant  on 

If you are removing an existing building, can the waste from the building be counted if you are recycling it?

4
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Tue Jan 22, 2019, 8:21 am