farmers

Pilot-Credits SSpc82:Local food production
posted by  Matthew VanSweden  on 

Out of curiosity, has anyone in pursuit of this credit or in its development talked to an actual farmer [or grower]?

3
Director of Intersectional Professional Services
LEEDuser Basic Member
41 thumbs up
Tue Mar 31, 2015, 7:54 pm

Must I continue to audit if 50% is reached during PP

EBOM-2009 MRc7:Solid Waste Management—Ongoing Consumables
posted by  Vanessa Seibert  on 

Our building did divert 50% of ongoing consumables during out last LEED EBOM certification in 2010. We did perform a waste audit at that time so we acquired MRc6.

5
Principal, Architect
Verde Concepts
LEEDuser Basic Member
34 thumbs up
Tue Mar 31, 2015, 5:53 pm

Process Load of a factory applying LEED CS

CS-2009 EAp2:Minimum Energy Performance
posted by  Jatuwat Varodompun  on 

I have a factory to be built for rent. Thus, this project goes for CS since we only build the shell.

3
Tue Mar 31, 2015, 3:32 pm

Daylight dimming with manual electric curtain

NC-2009 EAp2:Minimum Energy Performance
posted by  Jatuwat Varodompun  on 

My project has a dayligh dimming system and alos the curtain of each window. The reviewer ask me to add the effect of how this curtain will be modeled.

3
Tue Mar 31, 2015, 2:25 pm

Existing building

CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Charalampos Giannikopoulos  on 

When reusing an existing building (major renovation) then only new flooring materials would be applicable for the credit?

2
Tue Mar 31, 2015, 1:10 pm

Air Curtain in conditioned space

NC-2009 EAp2:Minimum Energy Performance
posted by  Jatuwat Varodompun  on 

How should we model the air curtain at the building entrance? Should we model as process load for both baseline and proposed?

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Mar 31, 2015, 1:20 am

Occupancy Proof

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Deepika Parmar  on 

What is the documented proof required to be submitted to USGBC confirming on the Occupancy considered for our project.

2
NH Green Consulting
LEEDuser Premium Member
80 thumbs up
Mon Mar 30, 2015, 7:09 am

Criteria for Space usage type

NC-2009 PIf3:Occupant and Usage Data
posted by  Alicia Villanueva  on 

How should I select the column "Space Usage Type" for each space. My criteria is to assign the type of space which each particular room serves.

2
Fri Mar 27, 2015, 10:39 pm

C&S Individual Project within a Campus Registration

LEED Guidance for Campuses and Multiple Buildings
posted by  Nate Steeber  on 

This may be a very simple question, and perhaps our team is looking into this too deeply: We have a campus which we intend to use a Master Site with individual registrations (i.e. not a group).

3
Project Manager, Sustainability
Sol design + consulting
LEEDuser Basic Member
13 thumbs up
Fri Mar 27, 2015, 9:07 pm

Integrated System - Space heating and water heating

NC-2009 EAp2:Minimum Energy Performance
posted by  CT G  on 

We are working in a project that has a gas-fired boiler that supplies hot water for space heating (radiant floor) and domestic hot water. Do we need to comply with efficiencies in tables 6.8.1F an

3
Default Avatar
LEEDuser Premium Member
19 thumbs up
Fri Mar 27, 2015, 6:27 pm