Forum quick links
What About Multi-Family Residential Buildings?
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Lance Collins on
Multi-family residential buildings are currently not eligible to receive an Energy Star score in Portfolio manager.
Location
Schools-2009 MRp1:Storage and Collection of Recyclablesposted by Eri Spaulding on
Guidelines refer to a "dedicated recycling collection and storage area that is easily accessible whithin the building".
Shall canopies attched to building include in building footprint
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Na Xing on
Hi, Could anyboday help me. We are working on a factory project.
WEp1 - Handheld bidet faucets
CS-2009 WEp1:Water Use Reductionposted by Tapio Peltonen on
Every toilet stall in the project includes a handheld bidet faucet (or spray) and a lavatory. Are these calculated as lavatory faucets or ignored in the water use calculation?
Deriving Minimum Efficiency Requirements for Baseline Chillers
NC-2009 EAc1:Optimize Energy Performanceposted by heinrich post on
We are wondering how to interpret the Minimum Efficiency Tables of Chapter 6.8 in ASHRAE 90.1-2007 to model HVAC efficiencies of baseline equipment. Our baseline building has a floor area > 150.
Accepting other testing methods
CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Petra Hajná on
Building materials are required to comply with SCQAMD rules which state VOC limits for various types of materials.
Recommissioning vs Commissioning experience for CxA
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Dustin Campbell on
We would like to get a comment from someone that has had experience with this: When selecting a CxA, would someone that has eperience on 2 or more projects as the "Recommissiong Authority" be suff