Forum quick links
Fundamental Commissioning vs Enhanced Commissioning
CI-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Zeb Foss on
Hello, I am in Canada so we are sill required to use LEED CI 1.0, and I have a question regarding the responsibilities of the CxAs.
SS 7.1-4 LEED Online form issues?
EBOM-2009 SSc7.1:Heat Island Reduction—Nonroofposted by Wendy Parker, LEED AP on
Is anyone else having issues with filling in the Non-reflective parking spaces table in this form?
Factory Space Default value
CS-2009 IEQp1:Minimum IAQ Performanceposted by John Covello on
Hello, We have a client who is designing a C&S factory. They are not sure who the tenant will be other than a factory space.
Residential grade dishwasher in breakroom
Retail-CI-v2009 WEc1:Water use reductionposted by Robin Dukelow on
The WEp1 language reads: ". . . and are not commercially rated MAY also be excluded.
Fan power calculations
CS-2009 EAp2:Minimum Energy Performanceposted by Eleni Soulti on
Hello, We have received a review from LEED saying that for the baseline model there are inconsistencies between the demand values reported in Table EAp2-5 and Table 1.4. When completing Table 1.4
NAF (GLUE) LETTER
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by jack larson on
I have a letter from the manufacturer stating that the laminating adhesive that will be used in the fabrication of the doors contains no added formaldehyde. (NAF).
LEED v4 Required Standards list
posted by Andres Schwarz on
Do you know where I can get a list of all the required standards in LEED v4 in a single unifed list? I am looking for the ones we most work with- i.e. ASHRAE 90.1, 62.1, etc.
Forniture in IEQc8.1 option 1
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by FABIO VIERO on
Dear all, I'm now working on a project (office building, new construction) under LEED NC v2009 Certification.
Flow Restrictors
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Malek Abualhaj on
Hello, we have non compliant faucets and showerheads, therefore, we are going to install flow restrictors. Would we need to test them at 60 and 80 psi?
Packaging products
EBOM-2009 MRc1:Sustainable Purchasing—Ongoing Consumablesposted by Gabriel Frasson on
I was wondering if some packaging of products that adress IEQ requirements but also attend one or more MRc1 criteria can be used here, like soap packing. Other question is, shampoo and/or band-aid