BMPs in series
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Tristan Roberts on
I heard a comment from a LEED user that GBCI reviewers do not understand the application of Best Management Practices in series.
Applicability of LEED credits to Master Site
posted by Rosemary Ziemann on
There are a number of LEED credits which theoretically should be applicable to an entire campus (i.e.
Are Clerestory Windows considered a roof, or a window?
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Mark Elsensohn on
I am working on a Healthcare v2009 project where we are removing and infilling a bunch of clerestory windows.
Enclosed Room?
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Carrie Laurendine on
Can the "dedicated space" be a space set aside in part of a bigger "back of house" service room (near loading dock)?
weather file
NC-2009 EAc1:Optimize Energy Performanceposted by Sonia Martini on
Hi What's the necessary documentation needed when submitting a simulation run with a self-made weather file (based on historical data)? Thanks Sonia
Minimum number of equipments to be audited
EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysisposted by ESD Singapore on
Hi all, The project that we are working on would like to go pursue this credit using ASHRAE level 2 commissioning audit path. However, this project has a large quantity of AHUs and FCUs (approx.
exhaust systems for hazardous gas and chemical use areas
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Adam Targowski on
All hazardous gas and chemical use areas have to have appropriate ventilation systems.
Off-site Native Vegetation
CS-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Phil Meyer on
Can anyone clarify how we can achieve SSc5.1 through the use of off-site native vegetation? Do we use an alternative compliance approach and submit forms from LEED EBOM for this same credit?
Same Fixtures Different Usage Groups
CI-2009 WEc1:Water Use Reductionposted by padraic o connell on
Hello, I have assigned two fixture usage groups within a building; A daycare usage group (12 FTE) and General Office usage group (140 FTE).
Mixed-use model for residential
CS-2009 EAc1:Optimize Energy Performanceposted by charles bell on
RE: LEED CS EAc1 We need input on how to model the 6th floor residential portion of our mixed-use building? Our specific concern is the lighting. Any help is appreciated. Thanks--