Forum quick links
concession area window/roll up door exposed to the outside
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by renee jimenez on
I’m working on a facility that has several concession areas that are enclosed with a solid roll up door that are open to the outside when occupied. The space is occupied only during event.
Salvaged and Regional Materials
EBOM-2009 MRc3:Sustainable Purchasing—Facility Alterations and Additionsposted by Summer Gorder on
For materials that were removed during demo and then re-used during construction, can you count these materials as salvaged as well as regional, meaning can you count the cost twice?
Multi-family - Energy Disclosure Requirement
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by Jeremy Kuhre on
Courtney, we have a similar situation to yours in that we do not have access to whole building utility data. We are currently in the process of certifying several large multi-family projects under
Modified AHU
CI-2009 EAp2:Minimum Energy Performanceposted by Silvia Ruiz on
Hi, If an AHU (initially outside of the scope of work) had to be modified in order to comply with the ventilation requirements of Standard 62.1-2007, does it have to comply with the requirements
non certifiable building
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by renee jimenez on
what is the definition of a non-LEED-certifiable building? does it mean your not going to attempt to certify them or that they dont qualify/meet minimum requirements?
Fly Ash
CS-2009 MRc3:Materials Reuseposted by Jeremy Theodore on
Same question, but I assume fly ash used in concrete is considered recycled content?
Can a LEED-NC project be added LATER to a master site future?
posted by Alice Sung on
Question: I have new LEED-NC project for a building on a college campus.
1/2 mile distance to basic services..
NC-2009 SSc2:Development Density and Community Connectivityposted by Hanne Goa on
Our project is located within 1/2 mile radius of more than 10 basic services. There is pedestrian access between the building and the services.
HAP boiler input data
NC-2009 EAp2:Minimum Energy Performanceposted by PAWAN DAHIWAL on
is estimated max load reported in HAP boiler input data for baseline case same to that of total heating capacity reported in Table 1.4 HVAC (water side) for baseline???. In one of the project Est
Manufacturing facility: heat recovery and cooling of compressors
NC-2009 EAc1:Optimize Energy Performanceposted by Johannes Gellrich on
Dear all, I have a large manufacturing facility with an associated office wing, on which I would like to discuss two things: 1.