posted by sam Alfassy on
i can not make the leed online interface show normalyy - all text is alligned to the right side of the screen. I am working with a left to right interface (for hebrew language) i have downgraded my
submit to leed-online compliance
CS-2009 EAc5.1:Measurement and verification - base buildingposted by Ron Dean on
Good day, i wonder what is the time that I can submit the M&V plan for credit 5.1. May I submit it when the construccion is finished with the rest of the credits for C&S certification or I
NC Innovation credits from EBOM, design or construction review?
posted by SmithGroup BG+LU FW on
If an ID credit is first submitted during preliminary review for design credits and the reviewer's comments require client input that will take longer than 25 (working) days for us to document can
Why aren't all v4 credits and prereq's available for comment?
posted by Joseph F. Bridger on
I was confused to see that I could not post comments for LEED v4 for all of the credits and prereq's I had assembled comments for. Why are some available and some not?
Attempting to comment on LEED v4
posted by Kathleen Roberts on
It seems the section that my organization wishes to comment on is not open for comment, although that certainly was not clear in our review of the draft.
GCBI project review cost
NC-2009 PIf2:Project Summary Detailsposted by Michael Kros on
I submitted a project for D&C review. The project is a 25,000 SF addition to an already LEED certified building of 60,000 SF.
EBOM for Residential Condominium: Possible?
posted by Gary Shlifer MS, LEED AP BD+C, Homes on
Does anyone have any experience or know of a successfully certified Highrise Residential Condominium building? As we all know the reference guide mentions certification for residential highrise, bu
Reuse of Light Fixtures and Mechanical Vents
CI-2009 IDc1:Innovation in designposted by Caro Wilbanks on
I am wondering if the reuse of light fixtures and mechanical vents has ever been used towards an ID credit. I understand that these divisions are not counted towards any of the MR credits.
Baseline System Selection - larger heated space - smaller cooled
NC-2009 EAp2:Minimum energy performanceposted by Don Carsto on
Our case involves 16,000 sqft of cooled and heated space and 90,000 sqft of heated-only space. The two spaces happen to be separated by a 4-hour fire wall.
ASHRAE 90.1 appendix G - VAV modelisation in baseline system 7
NC-2009 EAc1:Optimize energy performanceposted by Julien Daclin on
Hi, I have a question about the interpretation of section G3.1.3.13 (VAV minimum flow setpoints).