Brown Field redevelopement
NC-2009 SSc3:Brownfield Redevelopmentposted by Sahar Abi-Ziki on
Hello, Due to budget issues, our client wants to decontaminate a portion of the site and not the entire site (only the areas were we are doing interventions).
Submitting in excel format instead of filling out form
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Kathryn West on
Has anyone ever submitted an excel sheet for this credit in lieu of filling out the whole form.
Building Space Flushout
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Weld Morse on
I am working on a Massachusetts public works maintenance facility. it involves 2 separate structures; an office building and a garage.
New Midrise Rating Selection Guidance
posted by Michelle Rosenberger on
Has anyone seen the newest release of the Rating System Selection Guidance (dated 1/27/14 on the download page no date on the document)? It indicates that multifamily residential buildings of 4 to
On-site duct manufacture
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Mauricio Ramirez on
Hi. One of the projects in which I'm involved will have on-site HVAC duct manufacture. Does this practice has any inconvenient for the compliance with the credit IEQc3.1?
LEED-CS sunset date
posted by Tristan Roberts on
I believe the standard GBCI policy on sunset dates is six years from the last date that a project could register under the given rating system.
100% OA SYSTEM?
NC-2009 IEQp1:Minimum IAQ Performanceposted by Weidong Luo on
an AHU with no return air supplies 100% OA to an office and a conference room with FCUs, the OA supply ducts connected to the FCU supply ducts.
Energy Model documentation and a why is it so...
posted by Jesse Robbins on
Tristan, Thanks for your offer to get answers. I don't yet have experience in a LEED v4 project, but have been unable to find documentation on using initial vs.
Hexavalent Chromium on groundwater
NC-2009 SSc3:Brownfield Redevelopmentposted by eirini matsouki on
Hi all, Our project is international and is under construction. We are keeping this credit on a stand-by, as during the design submission there was not any evidence of contamination.
Beta Testing
posted by Melissa Wrolstad on
When will USGBC post the results of the LEED Beta Testing?