Forum quick links
COC certificates- what should I be looking for?
NC-2009 MRc7:Certified Woodposted by Valerie Molinski on
For COC certificates, what should I be looking for? It's crazy that I have done many LEED projects but none of them have gone after MRc7, so here I am. I am currently working on an NC project that
Building Simulation for a non AC Facility
NC-2009 EAp2:Minimum Energy Performanceposted by Udana Ratnayake on
We are working in a Garment Factory project in Sri Lanka where the facility is to be LEED certified. Whole building will be put up as a non air conditioned facility.
Rainwater Harvesting
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Udana Ratnayake on
Is it possible to show compliance with this prerequisite by reducing potable water use by harvesting and reusing rainwater for flushing?
LEED CI -PI FORMS
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Yong Lee Low on
For our project which is aiming LEED CI, is a floor in an office building , and the building itself is part of a bigger complex comprising of 5 buildings in all. The PI 1 form has ITEM 4 stating "
Energy Star equipment category exemptions?
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Amy Mussen on
We're working on a LEED-CI office fit-out project in the UK.
Rated Power
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Lauren Fakhoury on
Is there a way to calculate rated power? I am trying to find the rated power of a printer.
Establishing the LEED Project Boundary
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Robert Mulcahy on
I’m trying to confirm the LEED Project Boundary. Normally, the LEED Project Boundary for a single building development would be the same as the site boundary.
Tennis Court use for meeting SSc5.2 Maximize Open Space
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by JOHN COOK on
Can we count count our Tennis courts - that are part of the project boundary towards our Space requirement in Case 2? The courts are hardscaped.
Glass partition system with aluminium frames
CI-2009 MRc4:Recycled Contentposted by Yong Lee Low on
We are using an interior partition system which includes aluminium frames and glass partitions.The aluminium frames have recycled content but according to the CSI masterformat list do we need to in