Forum quick links
Low-temperature chemical dishwashers
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Susan Di Giulio on
The kitchen consultant on our project has specified a Hobart LT-1 LOW-TEMP CHEMICAL DISHWASHER. While most Hobart products are E-Star, this one is not.
DES Option 2 – CHP with absorption chiller
NC-2009 EAc1:Optimize Energy Performanceposted by Qian Tang on
Hello, We are working on a LEED NC 2009 project with DES which the thermal plants consist except boilers and electric chillers also a cogenerator and an absorption chiller. We are thinking to follo
Footprint, at grade or below grade?
NC-2009 PIf2:Project Summary Detailsposted by Maria Porter on
Hi! I have a question similar to the one posted on Nov 18 2013 below.
Distributors location for MR c5
NC-2009 MRc5:Regional Materialsposted by María Fernanda Aguirre on
Hi there! Regarding regional materials do distributors facilities need to be counted within the 500 miles radius?.
When can construction review start for a NC project
posted by Pia Öhrling on
How much of the building must be ready before you can send in constuction review?
Regional Steel
NC-2009 MRc5:Regional Materialsposted by Chris Klehm on
We have steel on a project that is documented to be 99% recycled content, all recovered within 500 miles of the project site.
Crushed concrete
NC-2009 MRc4:Recycled Contentposted by Hrvoje Kvasnicka on
We will be using crushed concrete from an exiting building on site for subbase for access road. I understand this cannot be used for MRc3 Material Reuse, but rather for MRc4.
Modeling Water-source Variable Refrigerant Volume Systems
NC-2009 EAp2:Minimum Energy Performanceposted by Eric Webber on
Hey everyone, I have a question about the best software choice and modeling strategy for water-source VRV (or VRF) systems.
MR Project boundary in multi story building
CI-2009 MPR2:Must be a complete, permanent building or spaceposted by Kathleen Burke on
the building is 11 stories with an atrium. The tenant is taking part of 1, all of 2, part of 3, all of 4, NONE OF 5, half of 6 and all of 7.