Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Inconsistent Price Square Meters versus Square Feet

Pilot-Credits SSpc83:Offsite Financial Support for Habitat Protection
posted by  Ben Stanley  on 

We're pursuing this pilot credit for an EBOM project and it looks like the stated price for financial support is inconsistent if your reporting site area in square meters ($0.5 /square meter) versu

0

v2009 Min. Performance Calculator - Service Hot Water Inputs

CS-2009 EAc1:Optimize Energy Performance
posted by  Ciaran McCabe  on 

With reference to Service Hot Water should the following baseline inputs match the proposed; If not where can I find good guidnace on how these baseline inputs can be obtained.

1
Wed Nov 2, 2016, 7:46 pm

RE: SSc5.1: It looks like a greenfield site but may not be???

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Joe Manganelli  on 

Hi All, I am working on a 200 acre site that looks like greenfield farmland.

1
Sat Jan 7, 2017, 10:52 pm

shared waste area

EBOM-2009 MRc7:Solid Waste Management—Ongoing Consumables
posted by  Agnieszka Rylska  on 

I am working on two projects which will be certified separately. They are located next to each other and they share waste area and waste bins.

1
Thu Jul 6, 2017, 6:33 pm

Small entryways

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Sara Johansson  on 

Hello, What if a project has small retail stores on the bottom floor, less than 3m long, and the ground outside doesn't belong to the property owner but the municipality (and therefor not possible

1
Tue Jan 17, 2017, 5:23 pm

Projects in California

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Brightworks Sustainability  on 

If local requirements are not as stringent as LEED requirements, are we still required to meet LEED requirements beyond local standards?

1
Thu Nov 3, 2016, 7:27 pm

Default Space Susage Types - are there definitions?

CI-2009 PIf3:Occupant and Usage Data
posted by  Stacey Olson  on 

I have a building which is permitted as B occupancy (office), which provides services to outpatients, but does not diagnose or exam. Is there a definition of "Medical Use" I can refer to?

1
Sat Aug 26, 2017, 11:55 pm

Interesting tools but too expensive

General forums
posted by  Andres Schwarz  on 

From my point of view, I would have liked to actually use one of these tools, but each time I asked for pricing, we couldn't even think of using it, they were too expensive.

1
Wed Nov 9, 2016, 3:52 pm

Increasing Baseline Static Pressure for Sound Regulations

Schools-NC-v4 EAc2:Optimize energy performance
posted by  Keith Lane  on 

We're working on a project where in order to comply with local noise regulation requirements, the Proposed design required indoor air handling equipment with fully ducted exhaust/intake air connect

1
Fri Nov 11, 2016, 5:13 pm

Documents Required For pre-certification for LEED V4 Core Shell

CS-v4 MPR1:Must be in a permanent location on existing land
posted by  Aqrab Ali Rana  on 

I have project of apartment in Pakistan, What are documents required for all credits actually??Do I have to submit all documents as I submit for preliminary review or just to tell the strategies an

1
Fri Nov 4, 2016, 3:25 pm