Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

WEp1 for Shopping Center

LEED Guidance for Campuses and Multiple Buildings
posted by  Nate Steeber  on 

Hello all, We have a shopping center interested in certification with 10 buildings.

1
Sat Jan 16, 2016, 2:13 am

Air Quality Testing - Elevator Lobbies in Parking Garage

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Katherine Wilde  on 

Our project has 4 garage levels. There are 3-4 elevator lobbies on each level. The lobbies are small and receive OA from RTUs serving the offices above.

1
Fri Nov 27, 2015, 8:44 pm

MRc7 How does this credit work?

NC-2009 MRc7:Certified Wood
posted by  Sara Axon  on 

If we are asked to provide for 1 point or 50% FSC Wood by cost but are making casework, do we have to ship the casework as FSC certified?

1
Thu Apr 9, 2015, 5:55 pm

FSC Certified Millwork

NC-2009 MRc7:Certified Wood
posted by  Andy Prestridge  on 

We have a fair amount or T&G wood that is being installed on the Ceiling.

1
Thu Apr 9, 2015, 5:58 pm

Major Renovation vs. New Construction

NC-v4 EAc2:Optimize energy performance
posted by  Eric Webber  on 

We are in the conceptual design phase of a project consisting of renovations to an existing building and a significant addition.

1
Thu Apr 9, 2015, 11:08 pm

case 1, however what happens if space will be owned

CI-2009 EAc3:Measurement and Verification
posted by  Courtney Royal  on 

for example, the project is a large building with a commercial spaces on each floor that will be sold.

1
Tue Apr 14, 2015, 2:46 pm

Reopening one path of LEED-CI SSc1.2 in Construction Review

CI-2009 SSc1:Site Selection
posted by  Susan Di Giulio  on 

In preliminary design review, we had attempted the Brownfields point, which is an option in SSc1.2.1, as well as 4 other points in that credit.

1
Tue Jan 12, 2016, 3:32 pm

Exhaust fan for chemical storage

CI-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Yaser Al Sharif  on 

If We have chemical storage room with 69.4 ft square in Area in our building , i want to install one exhaust fan for this room to acheive credit requirements , how can i calculate minimum pressure

1
Mon Apr 13, 2015, 2:58 pm

Open planters definition

NC-2009 WEc1:Water Efficient Landscaping
posted by  Laura Charlier  on 

What does “Open Bottom Planters” mean? I assume they drain to ground water – and not to a weep hole in the face of the wall, and then to storm? Thanks.

1
Fri Nov 27, 2015, 7:36 pm

LEED v4-Why did you vote yes or no?

General forums
posted by  Elizabeth Ann Satterfield  on 

I am doing research on the voting of LEED v4. I know that overall, 86% of USGBC members voted yes. My question is, why did they decide to vote yes? And if you voted no, why?

1
Tue Apr 14, 2015, 4:00 pm