New building overlapping an existing LEED property boundary
posted by Scott Scales on
We are designing a new building on a site adjacent to an existing LEED v2.2 certified building (designed by another architect); both buildings are owned and operated by the same entitiy and there a
timeline for investigation and analysis
EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysisposted by Pablo Fortunato Suarez on
My clients have prepared six-sigma projects for improvement that have a timeline of 5 years (since 2006).
Sealant for Joints
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Maya Karkour on
Hi, I am was wondering if the sealants for concrete joints (slab on grade) at a basement level, must comply with the requirements.
MR c3.2 Materials Reuse - Furniture & furniture
CI-2009 MRc3.2:Materials Reuse—Furniture and Furnishingsposted by Pamela Branch on
My client is a small non-profit, and on a shoe string budget. They are using used or donated furniture for 100% of their Furniture/Furnishings.
LEED for District Cooling Plant
posted by Banafsheh Shobeiri on
We are working on a DCP with associated parking space and a minor office space. Is LEED NC appropriate for this utility building?
Part II AGMBC timeline
posted by Melissa Merryweather on
Glad to finally get the partial update to Part II. Frustrated to see that the on-line advice on fees still relates to Part I, nothing on Part II yet.
IEQp1 compliance for high-rise with 1 outdoor air intake
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Dawn Brenner on
The 1987 high-rise building in California I am attempting LEED certification for has an EnergyStar label and, thus, was signed off by a PE as meeting ASHRAE 62.1/2007.