Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Two buildings connected with the same HVAC system

NC-2009 EAp2:Minimum Energy Performance
posted by  Francesco Passerini  on 

I’m going to model two buildings that are on the same site and are of the same owner. The owner wants to achieve the LEED certification for both. The buildings aren’t attached, i.e.

2
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Tue Jan 7, 2014, 8:40 pm

District / Campus Energy - Modeling Option 2 (Full accounting)

NC-2009 EAp2:Minimum Energy Performance
posted by  Maya Karkour  on 

Dear All, I am intending to model a building on campus which is connected to a campus energy system providing chilled water and hot water.

3
Default Avatar
EcoConsulting
LEEDuser Basic Member
549 thumbs up
Tue Jan 7, 2014, 7:26 pm

WE p1 requirement for Industrial shell building

CS-2009 WEp1:Water Use Reduction
posted by  Karl Heitman  on 

We are working on a speculative 1,000,000 SF industrial warehouse which is pursuing a LEED CS.

3
Default Avatar
President
Heitman Architects Inc
LEEDuser Premium Member
4 thumbs up
Tue Jan 7, 2014, 5:30 pm

Food service building in Colombia - FTE's

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Edgar Rodriguez  on 

We are starting a project (food service building) taht will serve to the users of other individual buildings of the same company, all of them are within the propoerty of the company and are not LEE

2
Tue Jan 7, 2014, 5:23 pm

Does anyone have experience with LI 10296?

NC-2009 MRc7:Certified Wood
posted by  Tiffany Moore  on 

I just got review comments back that refer to this LI.

2
Principal
Jason Grant Consulting
LEEDuser Expert
115 thumbs up
Tue Jan 7, 2014, 2:53 pm

Lime powder or cement to improve soil.

CS-2009 SSp1:Construction Activity Pollution Prevention
posted by  Michael E. Edmonds-Bauer  on 

A contractors asked us about lime powder or cement and soil contamination. The contractor would like to scratch the soils surface then spread lime powder or cement, this is for the soil to be impr

3
Mon Jan 6, 2014, 8:43 pm

Bus Frequency

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Sean Hogan  on 

Our office/labs/pilot plant project will provide a compliant bus stop at the site entrance and a local bus company has agreed to divert an existing bus route which connects the town's rail station,

8
Sr Project Manager / Operations Manager
Progressive AE
LEEDuser Basic Member
25 thumbs up
Mon Jan 6, 2014, 7:28 pm

Is it really the windows?

General forums
posted by  Francis Chua  on 

Dennis: I have experienced weak cell phone signal in a brand new 4-story 180-bed long term care facility. But I'm not sure if it is due to the low-e glazing.

4
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Mon Jan 6, 2014, 6:27 pm

How to calculate Raw Material distance for Option 2?

NC-2009 MRc5:Regional Materials
posted by  Charles Clark Jr  on 

I am still confused about how to calculate the raw material distance for Option 2. I understand how to calculate the distance from the manufacturing facility to the job site.

3
Mon Jan 6, 2014, 5:48 pm

Tinted Glass Material Threat Factor

Pilot-Credits SSpc55:Bird collision deterrence
posted by  Sara Goenner Curlee  on 

When I review the Material Threat Factors for the different glazing options, I do not see tinted glass listed anywhere. Am I blind? Or am is it considered the same as clear glass?

2
Sites Technical Specialist, LEED
USGBC
LEEDuser Premium Member
47 thumbs up
Mon Jan 6, 2014, 5:14 pm