2012 EPA CGP comply with this prerequisite?
CS-2009 SSp1:Construction Activity Pollution Preventionposted by Pamela Svetllana Santos Souza on
I'm modelling for LEED C&S 2009 and the project has 26 floor type of mixed-use offices. Does the 2012 EPA CGP can be used instead of 2003 EPA CGP to comply with this prerequisite?
EBOM-v4 MRc2: Purchasing - lamps as an ID credit
CS-2009 IDc1:Innovation in Designposted by José Solis on
I'm not sure where to post a question about this credit as we are submitting it as an ID credit under Core and Shell v2009. I'm not sure how to proceed.
ERV
Homes-v4 EQp1:Ventilationposted by Gustavo De las Heras Izquierdo on
Has anyone installed an ERV ventilation system? Does it need to be Energy Star certified or this requirement is only for extractors?
Post construction AND Post Occupancy Flush Out
Schools-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Denise Domino on
3.2 IAQ Mgmt. Plan - What are your options if neither Option 1 or 2 were done?
PV covered parking
NC-v4 SSc5:Heat island reductionposted by Deborah Lucking on
We understand that buildings roofs with PV should be excluded from the roof calculations. Does that also mean that PV canopies over on-grade parking should be excluded?
Can I build a career in this industry without a relevant degree?
NC-v4 SSc5:Heat island reductionposted by David Baker on
I live in Southern California and I have a degree in public administration and I took a few graduate classes in public administration as well, but have never worked in that field.
100' Distance on a Campus
NC-v4 LTc6:Bicycle facilitiesposted by Brightworks Sustainability on
Hi all, My project is part of a campus where the owner is building a garage along with our project.
Resinous Flooring
CI-v4 EQc2:Low emitting materialsposted by Marcia Weekes on
Would resinous flooring be evaluated under the Flooring or Paints & Coatings category?
Hot Water and Chilled Water Primary- Secondary Pumping
NC-2009 EAp2:Minimum Energy Performanceposted by ESD Engineer on
My project has Primary chilled water pumping and multiple distribution pumps after the heat exchange serving various AHU/RTU cooling coils.
EN 13779–2007
NC-v4 EQp1:Minimum indoor air quality performanceposted by Francesco Passerini on
We are deciding between the use of EN 15251 and the use of ASHRAE 62.1. Do you have experience in applying EN 13779–2007?