Sefaira Software for Daylight calculation - sDA and ASE
CS-v4 EQc4:Daylightposted by Nuttanee Vongveeranonchai on
Dear All,
I found that Sefaira has calculated sDA and ASE which are required for LEED v4 Daylight compliance. Can I use this result for the submission?
Rainwater Events Calculator v4
NC-v4 SSc4:Rainwater managementposted by Carmen Mielecke on
Dear all, my 2 question refer to the rainfall events calculator. 1) the percentil is calculated on the historical data sheet. The amount is expressed in mm.
Enhanced Commissioning
CI-v4 EAc1:Enhanced commissioningposted by Lance Barron on
Is building envelope commissioning required for CI if the exterior walls and roof are not being touched? Thanks.
Locker Rooms as Changing facilities
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Ryan Christensen on
As I fill out the SSc4.2 credit form, I am having trouble reconciling my project into the changing facility vs. shower categories. The project has two large locker rooms with 100+ lockers.
BPDO Calculator
CI-v4 MRc3:Building product disclosure and optimization - environmental product declarationsposted by Christina Nontanovan on
Hello,
Book stack areas as non-regularly occupied?
NC-v4 EQc7:Daylightposted by Kavita Karmarkar on
Hi all,
Fans cycling during unoccupied hours
NC-2009 EAp2:Minimum Energy Performanceposted by Gopinath Vasu on
Method to report proposed case Energy consumption - On site Gas Engine based electricity generation
NC-2009 EAp2:Minimum Energy Performanceposted by Rahula Attalage on
Dear All,
I have received the following comment by the reviewer: