What constitutes a "Master Plan"?Schools-2009 SSc9: Site Master Planposted by Peter Doo on Jan 4, 2010, 8:29 am
Our project is essentially a build out of a school site. There is no capacity for new buildings however, we are showing the potential for small future classroom additions (4 classrooms). Will... Last reply: John Stouffer, Apr 11, 2016, 5:05 pm |
|
Calculations in the Letter TemplateSchools-2009 SSc9: Site Master Planposted by Lauren Sparandara on Jan 21, 2013, 4:31 pm
Hello, I understand that we have to meet the credits in the current submission and also show that we comply as a master site. However, I am confused about what goes into the actual... Last reply: Tristan Roberts, Mar 7, 2014, 10:15 am |
|
Site Master Plan- Light Pollution ReductionSchools-2009 SSc9: Site Master Planposted by Anya Fiechtl on Aug 10, 2011, 11:06 pm
Has anyone completed the... Last reply: Dan LeBlanc, Sep 6, 2011, 1:25 pm |
|
Master Plan vs. LEED Project BoundarySchools-2009 SSc9: Site Master Planposted by Dana Murdoch on Aug 9, 2011, 10:31 am
Does the master plan need to be the same as the LEED Project Boundary? We have a project where the public school district is adding a building to their existing 'junior high campus'. However, we... Last reply: Dan LeBlanc, Sep 6, 2011, 1:16 pm |
|
Defer to Construction Submittal?Schools-2009 SSc9: Site Master Planposted by Greg Hackett on Dec 13, 2010, 10:11 am
Do you need to defer this credit until the construction submittal if SSc7.1 is one of your 4 master plan credits? Thanks. Last reply: Tristan Roberts, Jan 10, 2011, 7:05 pm |
|
Retract Design Credits if Needed?Schools-2009 SSc9: Site Master Planposted by Terry Squyres on Dec 21, 2010, 3:36 pm
Is it possible to retract design submission credits if needed at the end of construction? On a large school project, the owner has recently brought up the possibility of changes to the... Last reply: Nadav Malin, Dec 23, 2010, 8:50 am |
|
What you are saying is indeedSchools-2009 SSc9: Site Master Planposted by Erik Bergstrom on Dec 9, 2009, 12:42 pm
What you are saying is indeed in line with the comments we received. However, what is the value in completing two calculations when, for stormwater, the Master Plan is a worst case scenario, and... Last reply: Shannon Gray , Dec 11, 2009, 3:55 pm |
|
Master Plan:Open SpaceSchools-2009 SSc9: Site Master Planposted by Erik Bergstrom on Dec 9, 2009, 12:55 pm
GIven that the requirement for Open Space is that it is to be "dedicated" over the life of the building, I'm having trouble deciding which plan (current, or master) to use for the SSc5.2 section... |
|
Site Master Plan- RecalculationsSchools-2009 SSc9: Site Master Planposted by Erik Bergstrom on Dec 7, 2009, 2:30 pm
According to our review team for a Schools project, we are required to provide documentation for each selected Master Plan credit. For example, for stormwater, they are asking us complete two... Last reply: Shannon Gray , Dec 7, 2009, 7:02 pm |