Forum quick links
Baseline case system selection- Exception
NC-v4 EAp2:Minimum energy performanceposted by Manikandan S on
Hi All,
IAQ Testing
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Kelly Searle on
I am working on a major renovation project - 11 story office building.
Metered Faucets w/less than 12 Sec Duration
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Michelle Rosenberger on
I have received my second metered lav faucet submittal with less than 12 sec from factory duration.
Split certification doubts
posted by Marina Curto on
Good morning,
Does economic analysis to forgo DES phaseout apply in V4?
NC-v4 EAp4:Fundamental refrigerant managementposted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on
In the 2009 Reference Guide, an alternative path that allows foregoing DES plant replacement through an economic analysis that shows DES replacement is economically unfeasible is clearly stated.
Pumps: Balancing Report HPs vs Design
NC-2009 EAp2:Minimum Energy Performanceposted by Gaston Viau on
Hi there
Data Commons & Pharos
posted by Tom Lent on
For those of you researching chemical hazards: The Chemical Hazard Data Commons referenced in the Pharos description above is now out of beta and
Core & Shell with HVAC as future / CI scope
NC-v4 EAp1:Fundamental commissioning and verificationposted by Stacey Olson on
If a project is a cold, dark shell without hot water, can commissioning be deferred as n/a or does a cxa still need to be engaged to preform OPR and BOD review?